工程造价专业英语课后答案
- 格式:doc
- 大小:56.50 KB
- 文档页数:2
Unit 7 P56I、Translate the following words into Chinese1、Reinforced concrete钢筋混凝土2、Rolled-steel轧制钢3、Weldability可焊性4、Aggregate骨料5、Mortar砂浆6、Deformation变形II、Translate the following words into English1、冲击荷载shock loading2、软钢,低碳钢mild steel/low carbon steel3、冷拉hard drawn4、黏土砖clay brick5、收缩shrinkageIII、Translate the following sentence into Chinese1、The modern civil engineer needs to deal with a variety of materials that are oftenintegrated in the same structure , such as steel and concrete , or are used separatelyfor construction projects , such as pavement form asphalt and Portland cementconcrete.现代土木工程师需要处理大量建筑材料。
有时多种材料使用在同一结构中,如钢筋和混凝土;有时建筑材料被分别使用在单独的建筑项目中,例如沥青路面和硅酸盐水泥混凝土。
2、The useful engineering properties of both unalloyed and allyed aluminum are lowspecific gravity , resistance to corrosion , high electrical conductivity and excellentforming properties.铝和铝合金的有用的工程特性都是低比重,耐腐蚀,导电性能高和成型性能好。
工程造价专业英语A卷答案一、汉译英题:(10小题,每题2分,共30分)1.政府机构-governmental agency (2分)2投标合同授予过程-bidding and contract award (2分)3. 项目规划、设计和施工-project planing,design,and construction (2分)4.卷入诉讼-involve someone litigation (2分)5.招标公告-notice to bidder (2分)6.材料价格-material price (2分)7.规划许可-planning permission (2分)8.法律框架-legal framework (2分)9.污水处理厂-waste water treatment plant (2分)10.确保即使付款-insures prompt payment (2分)二、英译汉题:5小题,每题4分,共20分)1、从某种程度上来说,每一个建筑项目都是独一无二的,并且没有两个相同的项目。
(4分)2、第一步是准备一份包含所有可供选择的承包商的名单。
(4分).3、给供应商和分包商足够的时间来准备他们的报价单,这一点很重要。
(4分)4、.使用现成的标准合同形式常常比设计更好。
(4分)5、为避免将来产生误解,业主和建筑商之间最好签订一份书面协议。
(4分)三、阅读题:(2小题,1小题36分,2小题24分,共60分)Construction ManagementⅠChoose the best answer according to the text.CDBA (8分)ⅡDecide the following statements are true or false.FTTFT (10分)ⅢPut the following English into Chinese1、从工程设计之初到建设工程完工,项目经理要与业主和建筑工程师进行通力合作,领导项目团队对工程的所有事项提供业务指导。
《工程造价专业英语》课程教学大纲课程名称:《工程造价专业英语》课程编码:暂空英文名称:Special English in construction cost总学时:30 学分:2适应层次:本科、专科专业英语学习开课学期:第四学期适用专业:工程造价(半脱产)课程类别:理论课程性质:专业拓展课先修课程:计价与控制建筑工程招投标与合同管理工程建设法规与案例学习形式:课堂多媒体教学一、课程性质及目的(一)课程性质本课程为工程造价文科专业拓展课。
本课程主要讲述工程造价专业相关理论的英语表述方法,并结合新的科技文献开拓学生视野,从而使学生掌握专业文献的特点及常用词汇以及相关的工程造价知识在专业英语中如何描述,使学生基本能够阅读和翻译本专业各种体裁的英文文献,具备初步的英文文献写作能力。
(二)课程目的通过对本课程的学习,目的是使使学生掌握专业文献的特点及常用词汇以及相关的工程造价知识在专业英语中如何描述,使学生基本能够阅读和翻译本专业各种体裁的英文文献,具备初步的英文文献写作能力。
教学目标:1.基础知识目标了解工程造价专业英语的特点;掌握工程造价专业英语的学习方法和翻译技巧;熟悉工程造价专业英语单词、句子成分、词类转化、词序转变、被动语态、后置定语、长句的翻译法及握撰写英文摘要的方法和技巧。
2.能力训练目标能运用所学习知识顺利阅读专业英语文章,初步具备阅读和翻译专业外文文献的能力。
3.个性品质目标培养学生专业外语的兴趣,积极了解专业知识的最新国外动态,主动拓展所学专业学科知识的能力。
二、课程内容及学习方法(一)课程内容序号教学内容内容要点教学标准一绪论1 工程造价专业英语的特点;2工程造价专业英语的学习方法和翻译技巧概述;3学习工程造价专业英语的目的和要求。
1.了解工程造价专业英语的特点;2.掌握工程造价专业英语的学习方法和翻译技巧。
二专业英语翻译法1 单词的翻译法2 词类转化的翻译法3 句子成分转化的翻译法4 词序转变的翻译法5 被动语态的翻译法6 后置定语的翻译法7 长句的翻译法1.了解词类转化、词序转变、被动语态、后置定语、长句的翻译法;2.熟悉并掌握工程造价专业英语单词、句子成分。
2019年工程造价工程师资格考试建筑工程专业英语历年真题解析Part I: 选择题解析1. A解析: 根据题干中的"what is 'budget cost'?",定位到第一段最后一句"In construction, this cost is typically referred to as the 'budget cost'.",因此答案为A。
2. C解析: 根据题干中的"what is an 'addenda'?",定位到第三段第一句"The addenda are additional drawings, specifications, or instructions that are issued by the architect or engineer during the bidding process.",因此答案为C。
3. B解析: 根据题干中的"how are bid bonds used in the bidding process?",定位到第五段第一句"Bid bonds are used to ensure that the selected contractor will enter into a contract and provide the required performanceand payment bonds.",因此答案为B。
4. D解析: 根据题干中的"What is the purpose of the construction schedule?",定位到第八段第一句"The construction schedule outlines the timeline and sequence of activities for the construction project.",因此答案为D。
江西理工大学成人高等教育学习平台2020年上学期期末考试批次专业:202001-工程造价课程:英语Ⅰ(高起本)1. (单选题) She ____ go to work by bus.( )(本题3.0分)A、 usedB、 used toC、 is used toD、 use to标准答案:B2. (单选题) I found a place, ____ myself, and reached for the menu.( )(本题3.0分)A、 seatB、 seatingC、 seatedD、 to seat标准答案:C3. (单选题) Do you enjoy ____ beside me?( )(本题3.0分)A、 to sitB、 satC、 sittingD、 sit标准答案:C4. (单选题) It isn’t white, such a color needs ____.( )(本题3.0分)A、 cleaningB、 being cleanedC、 cleanedD、 to clean标准答案:A5. (单选题) They seem to be never satisfied ____ they can gain the whole world.( )(本题3.0分)A、 becauseB、 ifC、 unlessD、 once标准答案:C6. (单选题) The beggar was ____ excited ____ he could hardly wait.( )(本题3.0分)A、such…asB、such…thatC、so… asD、so…that标准答案:D7. (单选题) Tom writes well; Mary writes ____; but Mike writes____.( )(本题3.0分)A、well…betterB、well… bestC、better…betterD、better…best标准答案:D8. (单选题) ____ poor and unemployed were forced to leave for America.( )(本题3.0分)A、B、 TheC、 TheseD、 Some标准答案:B9. (单选题) The people’s government has set ____ a number of colleges in the countryside.( )(本题3.0分)A、 offB、 outC、 upD、 in标准答案:C10. (单选题) Tommy was very poor. He ____ not go to school.( )(本题3.0分)A、 canB、 couldC、 mayD、 might标准答案:B11. (单选题) ____ you like it or not, I don’t care.( )(本题3.0分)A、 WhatB、 WhichC、 WhetherD、 If标准答案:C12. (单选题) Don’t forget that you ____ me $5.( )(本题3.0分)A、 costB、 spendC、 oweD、 take标准答案:C13. (单选题) I had walked in ahead of Kay, but the shopkeeper pretended ____ me.( )(本题3.0分)A、 not to seeB、 to not seeC、 not to have seenD、 to not have seen标准答案:C14. (单选题) You ____ go over your homework before handing them in.( )(本题3.0分)A、 would betterB、 would ratherC、 had betterD、 had rather标准答案:C15. (单选题) The beggar understood what ____ do.( )(本题3.0分)A、 shall heB、 he shallC、 should heD、 he should标准答案:D16. (单选题) It’s difficult to imagine that a young man like him would be capable ____ murder.( )(本题3.0分)A、 ofB、 forC、 toD、 about标准答案:A17. (单选题) The right to pursue happiness ____ us all with our birth.( )(本题3.0分)A、 issuesB、 is issuedC、 is issuedD、 is issued to标准答案:D18. (单选题) No person can be persuaded either by such flying banners in the streets ____ by such ads on the TV.( )(本题3.0分)A、 andB、 norC、 butD、 or标准答案:D19. (单选题) To change is ____ efforts to deal with difficulties.( )(本题3.0分)A、 havingB、 makingC、 to haveD、 to make标准答案:D20. (单选题) I called ____ him to keep his promise.( )(本题3.0分)A、 inB、 forC、 onD、 over标准答案:C21. (单选题) The bike ____ he bought has been lost.( )(本题4.0分)A、 whoB、 whichC、 asD、 where标准答案:B22.(单选题) The news came to my ears quite ____ chance.( )(本题4.0分)A、 byB、 atC、 inD、 on标准答案:A23. (单选题) The doctor asked what ____ do for us.( )(本题4.0分)A、 he couldB、 could heC、 he canD、 can he标准答案:A24. (单选题) The book cost me only one dollar but it was really____.( )(本题4.0分)A、 worth to readB、 worthy readingC、 worth readingD、 worthy to read标准答案:C25. (单选题) The more often a fish is nearly caught, ____ difficult it will be to interest it next time.( )(本题4.0分)A、 theB、 the moreC、 moreD、 the most标准答案:B26. (单选题) Are you ready to do ____ the people want us to do?( )(本题4.0分)A、 thatB、 whichC、 whenD、 what标准答案:D27. (单选题) The Great Wall was so wide that armies could march ____ it.( )(本题4.0分)A、 at top ofB、 on top ofC、 at the top ofD、 on the top of标准答案:B28. (单选题) Sometimes they spoke lovingly of the country ____ the Flowery Land.( )(本题4.0分)A、 asB、 likeC、 forD、 of标准答案:A29. (单选题) His mother’s life has been so hard that she had finally ____ mad.( )(本题4.0分)A、 turnB、 comeC、 goneD、 seemed标准答案:C30. (单选题) Let’s stop ____ and hand in the paper.( )(本题4.0分)A、 writingB、 to writeC、 writeD、 written标准答案:A。
工程造价专业英语(第五版)。
全套
课件
本课程主要介绍《工程造价专业英语(第五版)全套课件》的内容概述以及研究目标。
课程内容丰富多样,涵盖了工程造价专业所需的英语知识和技能。
掌握工程造价专业中常用的英语词汇及短语理解工程造价专业的相关理论和实践
研究如何使用英语进行工程造价相关的沟通和交流
提高工程造价专业的英语表达和写作能力
通过研究本课程,您将能够更加自信地运用英语进行工程造价专业的研究和工作,为您的职业发展提供有力支持。
课程安排
该课程包括多个单元,每个单元都会介绍不同主题的内容,以便研究者全面了解工程造价专业英语的知识和技能。
每个单元包括课堂教学、题练和实践案例分析。
研究者可以通过课程提供的《工程造价专业英语(第五版)全套课件》进行研究。
此外,还可以参考相关教材、课外读物和在线资源来加深对工程造价专业英语的理解和应用。
学习者可以通过课程提供的《工程造价专业英语(第五版)全套课件》进行学习。
此外,还可以参考相关教材、课外读物和在线资源来加深对工程造价专业英语的理解和应用。
⏹(一)1.政府机构governmental agency2.承包商contractor3.分包商subcontractor4.建筑师architect5.保险公司insurance company6.担保公司surety company7.材料商material dealer/supplier8.施工现场construction site⏹(二)项目规划设计和施工project planning, design and construction临时设施temporary job facilities项目预算project budget投资和合同授予过程b idding and contract award process质量控制quality control项目的监督project supervision进度款progress payment合同变更contract change满足业主要求suit the individual owner's requirements以业主的名义in the name of the owner◆(三)卷入诉讼------ be involved in litigation公共工程------ public work承包商的注册-- contractors’ register某此因素------ certain factors合同工期------ duration of contract相对重要性---- relative importance担保能力------ bonding capacity现有工作任务-- current workload⏹(四)投标公告notice to bidders招标邀请函invitation to bidders标书格式bid forms标书分析bid analysis主要供应商major supplier投标保函bid bonds未预见情况unforeseen circumstances质量保证期quality guarantee period标书接收的地点和时间the time and place for the receipt of bids警察,消防和街道代表police, fire, and street department representatives●(五)材料价格material price 分包商的报价subcontractor's quotation机具设备租赁费equipment hire rates向供应商询价enquire supplier工程量清单bill of quantitie s墙砖wall tiles / brick防潮层damp-proof courses水泥cement粗骨料coarse aggregates回扣discount◆(六)平面布置图和立面图schematic layouts and elevations 规划许可planning permission建筑业管理许可building regulations approval工程质量project quality装修工程的造价the cost of decoration projects合同文本contract documents合同图纸contract drawings承包人义务contractor's obligations指定供应商和分包商specified suppliers and subcontractors开工和竣工时期the start and completion dates中期付款interim payments缺陷责任期the defects liability period⏹(七)法律框架legal framework相关各方parties concerned标准文本standard forms标准条款standard clauses特殊条款special clauses业主姓名the name of the employer工料测量师quantity surveyor公共机构public bodys签名和印章signature and seal印花税stamp duty●(八)投标明细或价值明细表bid breakdown or schedule of values污水处理厂wastewater treatment plant地下管线underground utility lines道路改建roads improvements开挖与回填excavation and backfill筑堤embankment延长英尺linear feet平方英尺square feet延期罚款条款liquidated damages clauses for delay工程造价construction pricing /cost of construction管理费和利润overhead and profit合同管理contract administration(九)造价师/工料测量师quantity surveyor建筑设计阶段building design stage可行性分析阶段feasible analysis stage概算approximate estimate施工图设计阶段construction drawing design stage建筑面积floor spac e成本效益分析cost and profit analysis养护费maintenance cost◆(十一)项目经理project manager现场管理Management of construction field项目成本和时间控制project cost and time control 技术复杂性technical complexity施工方法construction methods设计阶段design stage材料替代material substitute/alternatives管理机构regulatory agency材料和设备供应商material and equipmentsuppliers材料和设备的运输时间the delivery times ofmaterials and project equipment(十二)总承包商the general contractor业主the owner影响费用impact costs间接损失consequential damages项目总进度计划overall project schedule项目网络图project network变更条款change clauses备忘录memoranda延迟提交索赔defer claims submission提出索赔file a claim(十三)确保及时付款ensure timely payment提出和批准变更initiate and approve change主持现场会议support at the meeting谈判变更令negotiation to change加快验收和批准to speed up the acceptance andapproval评估索赔evaluate claim深化图和样品deepening figure and samples管理机电分包arrange for agency inspection控制临时设施contiol temporary facility执行施工计划construction plan of implementation 确认竣工图confirm completion figure drawing解释合同文件explain contract document仲裁争端arbitrates disputs监督试验程序supervition and experimental procedure 项目的实施project initiation竣工验收completion acceptance approval工程量表bill of quantity实际完成工程量actual finish of engineening工期索赔time claim费用索赔cost claim合同价格的变动the contract price fluctuation证明材料substantiation material。
工程造价专业英语课后习题答案一、句子翻译1.in its specifics ,each structure is tailed to suit its environment ,arranged to perform its own particular function ,and designed to reflect personal tastes and preferences . 具体来说,每一个建筑物都要适应它周围的环境,发挥它特有的功能,反映设计者的品味和喜好。
2.To some degree ,each construction project is unique ,and no two jobs are ever quite alike .从某种程度上来说,每一个建筑项目都是独一无二的,并且没有两个相同的项目。
3.It is unlikely ,that field construction will ever be able to adapt itself completely to the standardized methods and product uniformity of assembly-line production .建筑不可能完全适应标准化的方法和装配线生产的产品。
4.The objective of this approach is to treat project planning ,design ,and construction as integrated tasks within a construction system.该团队的目标是使工程规划、设计、建设成为工程项目系统之内的整合性的工作。
5.Adherence to construction schedules and budget constraints is the CM’s prime responsibility .确保在进度和成本约束下完成工程是项目经理的主要责任。
工程造价专业英语第四版答案1、Obviously they didn’t see the significance of the plan. That is()the problem lies. [单选题] *A. where(正确答案)B. whyC. /D. how2、30.I want to find ______ and make much money. [单选题] *A.worksB.jobC.a job(正确答案)D.a work3、The news is?_______. We are all _______ at it. [单选题] *A. exciting;?excited(正确答案)B. excited;?excitingC. exciting;?excitingD. excited;?excited4、There is something wrong with my teeth. I’ve had?a _______. [单选题] *A. toothache(正确答案)B. headacheC. stomachacheD. heartache5、Seldom _____ in such a rude way. [单选题] *A.we have been treatedB. we have treatedC. have we been treated(正确答案)D. have treated6、You cannot see the doctor _____ you have made an appointment with him. [单选题] *A. exceptB.evenC. howeverD.unless(正确答案)7、I _______ no idea of where the zoo is. [单选题] *A. thinkB. getC. have(正确答案)D. take8、—Where did you get the book?—From my friend. I ______ it three days ago. ()[单选题] *A. lentB. borrowed(正确答案)C. keptD. returned9、--What are you going to be in the future?--I want to be _______ actor. [单选题] *A. aB. an(正确答案)C. theD. /10、I do not have my own room,_____. [单选题] *A. neither does Tom(正确答案)B. neither has TomC. so does TomD. so has Tom11、Leave your key with a neighbor ___ you lock yourself out one day [单选题] *A. ever sinceB. even ifC. soon afterD. in case(正确答案)12、I don’t know how to improve my English. Can I ask you for some _______? [单选题] *A. answersB. advice(正确答案)C. questionsD. words13、Nobody noticed the thief slip into the shop, because the lights happened to _______. [单选题] *A. put outB. turn outC. give outD. go out(正确答案)14、What’s the price and what sort of _______ do you offer? [单选题] *A. advantageB. accountC. displayD. discount(正确答案)15、The young man had decided to give up the chance of studying abroad, _____ surprised his parents a lot. [单选题] *A. whenB. whereC. which(正确答案)D. that16、—The weather in Shanghai is cool now, ______ it? —No, not exactly. ()[单选题] *A. doesn’tB. isC. isn’t(正确答案)D. does17、My brother will come to see me tomorrow. I’ll meet?_______ at the airport. [单选题] *A. herB. youC. him(正确答案)D. them18、1——May I help you? You seem to be having some problems.——_______ , thanks. Ithink I can manage. [单选题] *A. All rightB. No problemC. It’s all right(正确答案)D. There’s no way19、46.The pants look cool.You can ________. [单选题] *A.try it onB.try on itC.try them on(正确答案)D.try on them20、Is there going to ______ a football match in the stadium next month?()[单选题] *A. beingB. haveC. be(正确答案)D. having21、We have _______ a double room with a bath for you in the hotel. [单选题] *A. boughtB. reserved(正确答案)C. madeD. taken22、There ______ a football match and a concert this weekend.()[单选题] *A. isB. haveC. will be(正确答案)D. will have23、56.Sam is in a hurry. Maybe he has got ________ important to do. [单选题] * A.everythingB.nothingC.anythingD.something(正确答案)24、--Mom, I will not eat fast food this year. Believe me.--If you make a _______, you must keep it. [单选题] *A. jokeB. noiseC. mistakeD. promise(正确答案)25、In 2019 we moved to Boston,()my grandparents are living. [单选题] *A. whoB. whenC. where(正确答案)D. for which26、How I wish I()to repair the watch! I only made it worse. [单选题] *A. had triedB. hadn't tried(正确答案)C. have triedD.didn't try27、--Henry treats his secretary badly.--Yes. He seems to think that she is the _______ important person in the office. [单选题] *B. least(正确答案)C. lessD. most28、He kept walking up and down, which was a sure()that he was very worried. [单选题] *A. sign(正确答案)B. characterC. natureD. end29、Customers see location as the first factor when_____a decision about buying a house. [单选题] *A.makeB.to makeC.making(正确答案)D.made30、27.Will it ______ warm in the room? [单选题] *A.areB.be(正确答案)D.going to be。
1.政府机构 governmental agency2.承包商 contractor3.分包商 subcontractor4.建筑师 architect5.保险公司 insurance company6.担保公司 surety company7.材料商 material dealer/supplier8.施工现场 construction site9.项目规划设计和施工 project planning, design and construction10.临时设施 temporary job facilities11.投资和合同授予过程 bidding and contract award process12.项目预算 project budget13.质量控制 quality control14.项目的监督 project supervision15.进度款 progress payment16.合同变更 contract change17.满足业主要求 suit the individual owner's requirements18.以业主的名义 in the name of the owner19.卷入诉讼 be involved in litigation20.公共工程 public work21.承包商的注册contractors’ register22.某此因素 certain factors23.合同工期 duration of contract24.相对重要性 relative importance25.担保能力 bonding capacity26.现有工作任务 current workload27.投标公告notice to bidders28.招标邀请函 invitation to bidders29.标书格式 bid forms30.标书分析 bid analysis31.主要供应商 major supplier32.投标保函 bid bonds33.未预见情况 unforeseen circumstances34.质量保证期quality guarantee period35.标书接收的地点和时间the time and place for the receipt of bids36.警察,消防和街道代表 police, fire, and street department representatives37.材料价格 material price38.分包商的报价subcontractor's quotation39.机具设备租赁费equipment hire rates40.向供应商询价 enquire supplier41.工程量清单bill of quantities42.墙砖 wall tiles / brick43.防潮层 damp-proof courses44.水泥 cement45.粗骨料coarse aggregates46.回扣 discount47.平面布置图和立面图 schematic layouts and elevations48.规划许可 planning permission49.建筑业管理许可 building regulations approval50.工程质量 project quality51 装修工程的造价 the cost of decoration projects52.合同文本 contract documents53.合同图纸 contract drawings54.承包人义务 contractor's obligations55.指定供应商和分包商 specified suppliers and subcontractors56.开工和竣工时期 the start and completion dates57.中期付款 interim payments58.缺陷责任期 the defects liability period59.法律框架 legal framework60.相关各方 parties concerned61.标准文本 standard forms62.标准条款 standard clauses63.特殊条款 special clauses64.业主姓名 the name of the employer65.工料测量师 quantity surveyor66.公共机构 public bodys67.签名和印章 signature and seal68.印花税 stamp duty69.投标明细或价值明细表 bid breakdown or schedule of values70.污水处理厂 wastewater treatment plant71.地下管线 underground utility lines72.道路改建 roads improvements73.开挖与回填 excavation and backfill74.筑堤 embankment75.延长英尺 linear feet76.平方英尺 square feet77.延期罚款条款 liquidated damages clauses for delay78.工程造价 construction pricing /cost of construction79.管理费和利润 overhead and profit80.合同管理 contract administration81.造价师 /工料测量师 quantity surveyor82.建筑设计阶段 building design stage83.可行性分析阶段 feasible analysis stage84.概算 approximate estimate85.施工图设计阶段 construction drawing design stage86.建筑面积 floor space87.成本效益分析 cost and profit analysis88.养护费 maintenance cost.。
设计造价考研英语真题答案Introduction:In recent years, the field of architecture and design has witnessed a significant increase in popularity and demand. As a result, the competition in the industry has become increasingly fierce, leading many aspiring designers to pursue higher education to enhance their skills and knowledge. One important aspect of this journey is the Design and Cost Evaluation postgraduate entrance examination, commonly known as the Design Cost Exam. In this article, we will provide answers and explanations to some of the questions from the Design Cost Exam in order to assist aspiring candidates in their preparation for this challenging test.Section 1: Listening ComprehensionQuestion 1:According to the conversation, why is the man consulting the woman?Answer: To improve the environmental performance of his design project.Explanation: The man seeks advice from the woman in order to enhance the sustainability and environmental impact of his design project.Question 2:What is the main topic of the news report?Answer: The completion of a large-scale architectural project.Explanation: The news report focuses on the successful completion of a significant architectural project, highlighting its scale and importance.Section 2: Vocabulary and StructureQuestion 3:Choose the correct form of the verb to complete the sentence:The architect ________ the design to the clients last week.a) presentsb) will presentc) presentedd) has presentedAnswer: c) presentedExplanation: The past simple tense is used in this sentence to indicate that the architect completed the action of presenting the design to the clients in the past.Question 4:Choose the word or phrase that best completes the sentence:The design team worked ________ to meet the project deadline.a) hardlyb) hardc) heavilyd) hardyAnswer: b) hardExplanation: The word "hard" is the correct adverb to describe the intensity or effort put in by the design team to meet the project deadline.Section 3: Reading ComprehensionPassage 1:Question 5:According to the passage, what is the main challenge faced by architects and designers in the construction industry?Answer: Balancing design aesthetics with cost efficiency.Explanation: The passage discusses the difficulty of achieving a balance between aesthetic design and cost-effectiveness, suggesting that this is the primary challenge faced by professionals in the field.Question 6:Which of the following statements can be inferred from the passage?Answer: The use of advanced technologies can help streamline the design process.Explanation: The passage mentions the benefits of utilizing advanced technologies, implying that their implementation can contribute to the streamlining of the design process.Passage 2:Question 7:According to the passage, what is the purpose of a cost estimate in the design process?Answer: To determine the budget and feasibility of a project.Explanation: The passage explains the role of cost estimates in the design process, emphasizing their significance in determining project budget and feasibility.Question 8:What is the advantage of using parametric cost estimating methods mentioned in the passage?Answer: It allows for more accurate cost projections and risk assessments.Explanation: The passage highlights the advantages of using parametric cost estimating methods, specifically mentioning their ability to provide accurate cost projections and risk assessments.Conclusion:In this article, we have explored and provided accurate answers to various questions from the Design and Cost Evaluation postgraduate entrance examination. By understanding the content and structure of the exam, aspiring candidates can better prepare themselves for this critical evaluation. Remember, success in the field of design and architecture goes beyond theoretical knowledge and requires a deep understanding of practical applications, cost considerations, and sustainable practices. Good luck withyour Design Cost Exam preparation, and may your passion for design guide you on a successful career path.。
乐山师范学院 2014 - 2015 学年第 2 学期期末考试《工程造价专业英语》试卷A卷用卷对象:经管学院 13 级工程造价专业本科 1、2 班说明:1、本试卷共 4 页,另加添卷纸页。
2、试卷共 3 个大题,满分100分。
3、本次考试为闭卷,考试时间: 120 分钟。
题号一二三四五六七八总分阅卷人分数1 2 3 4 5 6 7 8 9 101.政府机构2投标合同授予过程3. 项目规划、设计和施工4.卷入诉讼5.招标公告6.材料价格7.规划许可8.法律框架9.污水处理厂10.确保即使付款1、To?some?degree?,each?construction?project?is?unique?,and?no?two?jobs?are?ever?quite?alike?.2、The?initial?step?is?to?prepare?a?list?of?all?available?contractors.?3、.It?is?important?to?give?prospective?suppliers?and?subcontractors?as?much?time?as?possible?in?which?to?pr epare?their?own?quotation..4、It?is?always?preferable?to?use?one?of?the?standard?forms?available?,rather?than?to?devise?one’s?own?personal?form.5、In order to avoid any future misunderstandings,it is preferable to have a written agreement between the employer and the builder.得分三、阅读题:(2小题,1小题36分,2小题24分,共60分)Construction ManagementIn construction management the owner contracts with an architect-engineer for construction project design and with a construction management firm consulting , procurement, contract letting, and construction administration services. In so doing, a construction team is created consisting of the owner, the architect-engineer, and the construction manager(CM). The objective of this approach is to treat construction project planning, design, and construction as integrated tasks within a construction system. The CM works with the owner and the architect-engineer from the beginning of design until construction project completion, providing leadership to the construction team in all matters pertaining to construction. Adherence to construction schedules and budget constraints is the CM's prime responsibility.During the design phase, the CM advises with respect to performance criteria, construction feasibility of alternative building systems, site conditions, site conditions, and availability of materials and labor. I nformation pertaining to trade jurisdictions and temporary job facilities is also provided. W here long lead-time machinery, equipment, or materials are needed , the CM will make arrangements for their procurement and delivery. D uring the design process, the CM prepares preliminary, interim, and final construction project budgets and construction schedules.F ast tracking and phased construction are frequently used on construction projects of this type. T he construction manager handles the bidding and contract award process whereby work is contracted out to a succession of constructors as the various design phases are finalized. T he CM usually does not perform significant construction work with his own forces.During construction operations, the CM assumes responsibility for the supervision coordination, and administration of the construction project. Of top importance in this regard are coordinating the work of the separate contractors, checking the actual progress of the construction project against an established time schedule, and exercising every effort to keep the cost of the work within the approved budget. Also often involved are quality control, safety, progress payments, contract changes, claims, expediting, shop drawings , acceptance testing, and other elements of construction administration. The extent of services to be provided by the CM can be tailored to suit the individual owner’s requirements.Two different types of construction management contracts can be used. Under one type, the CM is made the agent of the owner. All actions of the CM, such as purchasing, contracting, disbursement, and construction supervision, are carried out in the name of and on behalf of the owner. Under principles of agency, the owner is fully responsible for the actions of the CM.A nother type of management contract is that in which the CM is engaged as an independent contractor . I n this case his actions are taken in his own name and on his own responsibility. The CM is liable for his own actions and remains responsible for the work until its completion and acceptance by the owner. Public owners cannot ordinarily make the CM their agent. Private owners, on the other hand, can and normally do in practiceⅠChoose the best answer according to the text. (8分)1.The primary responsibility of the CM is___________A.To give advice to performance criteriaB.To provide information about availability of materials and laborC.Adherence to construction schedules and budgetD.To provide information about temporary jobs2.Which is not the duty of the CM during the design phase得分一、汉译英题:(10小题,每题2分,共20分)得分二、英译汉题:5小题,每题4分,共20分)A.to offer advice on construction feasibility of alternative building systems.B.To make arrangements for procurement and delivery of the lead-time machinery and plantC.To prepare construction schedulesD.To check actual progress of the project against the schedule3.Which is not the responsibility of the CM during the construction operationA.Quality controlB.Handling the bidding and contract award processC.CoordinationD.Contract changes4.Which is not in the top importance list of responsibilities of the CM during the construction operationA. Accepting testB. Exercising every effort to keep the cost of the work within the approved budgetC. Checking the actual progress of the projectD. Coordinating the work of separate contractorsⅡDecide the following statements are true or false. (10分)1.The CM begins to work from the beginning of the site construction2.The owner should be the leader of the construction team3.The owner should be responsible for the action of the CM who is made the agent of the owner4.During construction operations,the CM prepares preliminary,interim,and the final project budget.5.The CM is usually engaged as an independent contractor in the public workⅢPut the following English into Chinese (每题6分,共18分)1、The CM works with the owner and the architect-engineer from the beginning of design until construction project completion, providing leadership to the construction team in all matters pertaining to construction. Adherence to construction schedules and budget constraints is the CM's prime responsibility.2、During construction operations, the CM assumes responsibility for the supervision coordination, and administration of the construction project. Of top importance in this regard are coordinating the work of the separate contractors, checking the actual progress of the construction project against an established time schedule, and exercising every effort to keep the cost of the work within the approved budget.3、Under one type, the CM is made the agent of the owner. All actions of the CM, such as purchasing, contracting, disbursement, and construction supervision, are carried out in the name of and on behalf of the owner. Under principles of agency, the owner is fully responsible for the actions of the CM.Contract documents and drawingsContract documentsA major advantage of using a standard document is that those who use it regularly become familiar with its contents.They thus become aware of both its strengths and its weaknesses,and the suitability for their own specific purpose.The contract documents under any building project should include,as a minimum,the following information:The work to be performed.This generally requires some form of drawn information.It assists the client by way of showing his schematic layouts and elevations.Even the non-technical employer is usually able to grasp a basic idea of the architect’s intentions.Drawings will also be necessary for planning permission and building regulations approval.Finally,they will be needed by the prospective builder in order that he can carry out the architect’s intentions during estimating and construction.On all but the simplest types of project, therefore, some drawings will be necessary.The quality of work required.It is not easy on drawings alone to describe fully the quality and performance of the materials and workmanship expected.It is usual ,therefore,for this to be detailed either in a specification or in a bill of quantities.The contractual conditions.In order to avoid any future misunderstandings,it is preferable to have a written agreement between the employer and the builder.For simple projects,the conditions appropriate to minor works may be sufficient.On more complex projects,one of the more comprehensive forms of contract should be used.The cost of the finished work.This should be predetermined,wherever possible,by an estimator from the builder.On some projects it may only be feasible to assess the cost once the work has been carried out.In these circumstances the method of calculating this cost should be clearly agreed.The construction programme.The length of time available for the construction work on site will be important to both the client and the contractor.The client will need to have some idea of how long the project will take to complete in order to plan his own arrangements for the handover of the project.The contractor’s costs will,to some extent,be affected by the time available for construction.The contract documents on a building contract normally comprise the following:Form of contractContract drawingsBill of quantities or specificationOn a civil engineering project it is more usual to include both a bill of quantities and specification.The JCT forms used on building contracts allow only one of these documents.Contract drawingsThe contract drawings should ideally be complete and finalized at tender stage. Unfortunately this is seldom the case,and both clients and architects rely too heavily upon the clause in the conditions allowing for variations.Occasionally it is due to insufficient time being made available for the pre-contract design work or,frequently,because of indecision on the part of the client and his design team. Tenders should,however,be given sufficient information to enable them to understand what is required in order that they may submit an accurate and realistic price.The contract drawing will include the general arrangement drawings showing the site location,the position of the building on this site,means of access to the site,floor plans,elevations and sections.Where these drawings are not supplied to the contractors with the other tendering information,they should be informed where and when they can be inspected.The inspection of these and other drawings is highly recommended since it may provide the opportunity for an informal discussion on the project with the designer.Each drawing should include:a.The name and address of the consultant(architect,engineer or surveyor)b.The drawing number,for reference an recording purposec.The scale ,if more than one scale is used they should be of such dissimilar proportions that they are readily distinguishable by sighte.The title,w hich will indicate the scope of the work covered on the drawing.ⅠChoose the best answer according to the text. (8分)1.The contract documents under any building project should at least include the following information:A.the work to be performed and the quality of work requiredB.The contractual conditions and the construction programC.The cost of the finished workD.All of the above2. According to the text,some drawings will be necessary for:A.helping the employer to understand the intention of the architectB.planning permissionC.building regulations approvalD.all of the above3.In order to describe fully the quality and performance of the materials,we can rely on:A.some drawingsB.specificationC.bill of quantitiesD.all of the above4.According to text,the contract documents on a building contract are normally composed of the followingA.contract drawingsB.form of contractC.specifications or bill of quantitiesD.all of the aboveⅡPut the following English into Chinese (16分)1.The length of time available for the construction work on site will be important to both the client and the contractor.The client will need to have some idea of how long the project will take to complete in order to plan his own arrangements for the handover of the project.The contractor’s costs will,to some extent,be affected by the time available for construction.(6分)2.Drawings will also be necessary for planning permission and building regulations approval.Finally,they will be needed by the prospective builder in order that he can carry out the architect’s intentions during estimating and construction.(6分)1.Their purpose is to attempt to clarify the rights and responsibilities of the various contractors in the event of a dispute arising. (4分)。
⏹(一)➢ 1.政府机构governmental agency➢ 2.承包商contractor➢ 3.分包商subcontractor➢ 4.建筑师architect➢ 5.保险公司insurance company➢ 6.担保公司surety company➢7.材料商material dealer/supplier➢8.施工现场construction site⏹(二)➢项目规划设计和施工project planning,➢designand construction临时设施temporary job facilities项目预算project budget投资和合同授予过程bidding and contractaward process质量控制quality control项目的监督project supervision7.进度款progress payment合同变更contract change满足业主要求suit the individual owner'srequirements以业主的名义in the name of the owner(三)卷入诉讼------ be involved in litigation公共工程------ public work承包商的注册-- contractors’ register某此因素------ certain factors合同工期------ duration of contract相对重要性---- relative importance担保能力------ bonding capacity现有工作任务-- current workload(四)➢投标公告notice to bidders招标邀请函invitation to bidders➢标书格式bid forms➢标书分析bid analysis➢主要供应商major supplier➢投标保函bid bonds➢未预见情况unforeseen circumstances➢质量保证期quality guarantee period➢标书接收的地点和时间the time and place➢for the receipt of bids➢警察,消防和街道代表police, fire,➢and street department representatives●(五)➢材料价格material price➢分包商的报价subcontractor's quotation➢机具设备租赁费equipment hire rates➢向供应商询价enquire supplier➢工程量清单bill of quantitie s➢墙砖wall tiles / brick➢防潮层damp-proof courses➢水泥cement➢粗骨料coarse aggregates➢回扣discount◆(六)➢平面布置图和立面图schematic layouts and elevations ➢规划许可planning permission➢建筑业管理许可building regulations approval➢工程质量project quality➢装修工程的造价the cost of decoration projects➢合同文本contract documents➢合同图纸contract drawings➢承包人义务contractor's obligations➢指定供应商和分包商specified suppliers and➢subcontractors➢开工和竣工时期the start and completion dates➢中期付款interim payments➢缺陷责任期the defects liability period➢⏹(七)➢法律框架legal framework➢相关各方parties concerned➢标准文本standard forms ➢标准条款standard clauses➢特殊条款special clauses➢业主姓名the name of the employer➢工料测量师quantity surveyor➢公共机构public bodys➢签名和印章signature and seal➢印花税stamp duty➢●(八)➢投标明细或价值明细表bid breakdown➢or schedule of values➢污水处理厂wastewater treatment plant➢地下管线underground utility lines➢道路改建roads improvements➢开挖与回填excavation and backfill➢筑堤embankment➢延长英尺linear feet➢平方英尺square feet➢延期罚款条款liquidated damages clauses➢for delay➢工程造价construction pricing /cost of➢construction➢管理费和利润overhead and profit➢合同管理contract administration➢(九)➢造价师/工料测量师quantity surveyor➢建筑设计阶段building design stage➢可行性分析阶段feasible analysis stage➢概算approximate estimate➢施工图设计阶段construction drawing➢design stage➢建筑面积floor spac e➢成本效益分析cost and profit analysis➢养护费maintenance cost◆(十一)➢项目经理project manager➢现场管理Management of construction field ➢项目成本和时间控制project cost and time➢control➢技术复杂性technical complexity➢施工方法construction methods➢设计阶段design stage➢材料替代material substitute/alternatives➢管理机构regulatory agency➢材料和设备供应商material and equipment➢suppliers➢材料和设备的运输时间the delivery times➢ f materials and project equipment➢Twelve➢总承包商the general contractor➢业主the owner影响费用impact costs➢间接损失consequential damages➢项目总进度计划overall project schedule➢项目网络图project network➢变更条款change clauses➢备忘录memoranda➢延迟提交索赔defer claims submission➢提出索赔file a claim《十三》总进度计划Master schedule项目的实施The implementation of the project竣工验收Final acceptance工程量表Engineering scale实际完成工程量The actual completion of engineering quantity《十四》工期索赔Claim for extension of time费用索赔Cost claim合同价格的变动Contract price费用的估价The cost estimate证明材料Materials of proof。
工程造价专业英语课后习题答案一、句子翻译1.in its specifics ,each structure is tailed to suit its environment ,arranged to perform its own particular function ,and designed to reflect personal tastes and preferences . 具体来说,每一个建筑物都要适应它周围的环境,发挥它特有的功能,反映设计者的品味和喜好。
2.To some degree ,each construction project is unique ,and no two jobs are ever quite alike .从某种程度上来说,每一个建筑项目都是独一无二的,并且没有两个相同的项目。
3.It is unlikely ,that field construction will ever be able to adapt itself completely to the standardized methods and product uniformity of assembly-line production .建筑不可能完全适应标准化的方法和装配线生产的产品。
4.The objective of this approach is to treat project planning ,design ,and construction as integrated tasks within a construction system.该团队的目标是使工程规划、设计、建设成为工程项目系统之内的整合性的工作。
5.Adherence to construction schedules and budget constraints is the CM’s prime responsibility .确保在进度和成本约束下完成工程是项目经理的主要责任。
assembly 安装baseline 基线bill of quantities 工程量清单blueprint 蓝图bulk materials 大宗材料claim 索赔construction contractors 施工承包商construction industry 建筑业construction operations 施工作业construction planning 施工计划construction 施工contract 合约cost estimation 成本估算design/construct process 设计/施工过程earthwork to be excavated 土方开挖economic evaluation 经济评价estimate stage 估算阶段evaluation stage 评估阶段expenditure 支出facility 设施feasibility 可行性financing 融资framework 框架,构架general contractor 总承包商infrastructure and heavy construction 重大基础项目建设infrastructure 基础设施job-site productivity 工地生产率maintenance 维护minium attractive rate of return最低收益率nominated subcontractor 指定分包商opportunity cost 机会成本overlap 重叠(搭接?)overseer 监督者owner 业主payment 支付procurement 采购production function 生产函数project alternative 备择项目project finance 项目融资project management 项目管理reimbursement 偿还schedule进度scheduling 进度计划shop drawings 施工图,安装图skyscraper 摩天大楼solvency 清偿solvency 清偿specialized industrial construction 专业化specialized subcontractor 专业分包商speculative housing market投机性住宅市场steel beams and columns 钢梁和柱subcontractors 分包商technical feasibility 技术可行性the cost engineer or estimator 估算师the project cycle life 项目全寿命期the real estate developer 房地产开发商the scope of the project 项目范围unforeseen expense 不可预见费用generally,project management isdistinguished from the general management ofcorporations by the mission-oriented nature of a project. 一般而言,项目的以目标为导向特征是项目管理与一般的企业管理的主要不同。
工程造价专业英语课后习题答案一、句子翻译1.in its specifics ,each structure is tailed to suit its environment ,arranged to perform its own particular function ,and designed to reflect personal tastes and preferences . 具体来说,每一个建筑物都要适应它周围的环境,发挥它特有的功能,反映设计者的品味和喜好。
2.To some degree ,each construction project is unique ,and no two jobs are ever quite alike .从某种程度上来说,每一个建筑项目都是独一无二的,并且没有两个相同的项目。
3.It is unlikely ,that field construction will ever be able to adapt itself completely to the standardized methods and product uniformity of assembly-line production .建筑不可能完全适应标准化的方法和装配线生产的产品。
4.The objective of this approach is to treat project planning ,design ,and construction as integrated tasks within a construction system.该团队的目标是使工程规划、设计、建设成为工程项目系统之内的整合性的工作。
5.Adherence to construction schedules and budget constraints is the CM’s prime responsibility .确保在进度和成本约束下完成工程是项目经理的主要责任。
专业英语Unit1第一题 1.设计/施工过程Design and construction process2.房地产开发商Real estate developer3.投机性住宅市场Speculative housing market4.项目管理Project management5.项目全寿命期Project life cycle6.项目范围Scope of a project/project scope7.专业化服务Professional services8.重大基础项目建设Construction of major infrastructure projects9.住宅类房屋建设Residential housing construction10.办公和商业用房建设office and commercial building construction11.专业化工业项目建设Specialized industrial projects construction12.专业咨询师Professional consultants13.总承包商Original contractor14.价值工程value engineering15.竞争性招标Competitive bidding16.建筑和工程设计公司Architectural and engineering design company17.运营与维护管理operation and maintenance18.设计/施工公司design and construction company19.分包商subcontractor20.设施管理facility management第一章1、从项目管理的角度看,“业主”和“发起方”是同义的,因为两者的基本权力是制定所有重大决策。
2、项目范围界定后,详细的工程设计将提供建设蓝图,最终费用估计将作为控制成本的基准。
⏹(一)
1.政府机构governmental agency
2.承包商contractor
3.分包商subcontractor
4.建筑师architect
5.保险公司insurance company
6.担保公司surety company
7.材料商material dealer/supplier
8.施工现场construction site
⏹(二)
项目规划设计和施工project planning,
designand construction
临时设施temporary job facilities
项目预算project budget
投资和合同授予过程bidding and contract
award process
质量控制quality control
项目的监督project supervision
7.进度款progress payment
合同变更contract change
满足业主要求suit the individual owner's
requirements
以业主的名义in the name of the owner
(三)
卷入诉讼------ be involved in litigation
公共工程------ public work
承包商的注册-- contractors’ register
某此因素------ certain factors
合同工期------ duration of contract
相对重要性---- relative importance
担保能力------ bonding capacity
现有工作任务-- current workload
(四)
投标公告notice to bidders
招标邀请函invitation to bidders
标书格式bid forms
标书分析bid analysis
主要供应商major supplier
投标保函bid bonds
未预见情况unforeseen circumstances
质量保证期quality guarantee period
标书接收的地点和时间the time and place
for the receipt of bids
警察,消防和街道代表police, fire,
and street department representatives
●(五)
材料价格material price
分包商的报价subcontractor's quotation
机具设备租赁费equipment hire rates
向供应商询价enquire supplier
工程量清单bill of quantitie s
墙砖wall tiles / brick
防潮层damp-proof courses
水泥cement
粗骨料coarse aggregates
回扣discount
◆(六)
平面布置图和立面图schematic layouts and elevations 规划许可planning permission
建筑业管理许可building regulations approval
工程质量project quality
装修工程的造价the cost of decoration projects
合同文本contract documents
合同图纸contract drawings
承包人义务contractor's obligations
指定供应商和分包商specified suppliers and
subcontractors
开工和竣工时期the start and completion dates
中期付款interim payments
缺陷责任期the defects liability period
⏹(七)
法律框架legal framework
相关各方parties concerned
标准文本standard forms 标准条款standard clauses
特殊条款special clauses
业主姓名the name of the employer
工料测量师quantity surveyor
公共机构public bodys
签名和印章signature and seal
印花税stamp duty
●(八)
投标明细或价值明细表bid breakdown
or schedule of values
污水处理厂wastewater treatment plant
地下管线underground utility lines
道路改建roads improvements
开挖与回填excavation and backfill
筑堤embankment
延长英尺linear feet
平方英尺square feet
延期罚款条款liquidated damages clauses
for delay
工程造价construction pricing /cost of
construction
管理费和利润overhead and profit
合同管理contract administration
(九)
造价师/工料测量师quantity surveyor
建筑设计阶段building design stage
可行性分析阶段feasible analysis stage
概算approximate estimate
施工图设计阶段construction drawing
design stage
建筑面积floor spac e
成本效益分析cost and profit analysis
养护费maintenance cost
◆(十一)
项目经理project manager
现场管理Management of construction field 项目成本和时间控制project cost and time
control
技术复杂性technical complexity
施工方法construction methods
设计阶段design stage
材料替代material substitute/alternatives
管理机构regulatory agency
材料和设备供应商material and equipment
suppliers
材料和设备的运输时间the delivery times
f materials and project equipment
Twelve
总承包商the general contractor
业主the owner
影响费用impact costs
间接损失consequential damages
项目总进度计划overall project schedule
项目网络图project network
变更条款change clauses
备忘录memoranda
延迟提交索赔defer claims submission
提出索赔file a claim
《十三》
总进度计划Master schedule
项目的实施The implementation of the project
竣工验收Final acceptance
工程量表Engineering scale
实际完成工程量The actual completion of engineering quantity
《十四》
工期索赔Claim for extension of time
费用索赔Cost claim
合同价格的变动Contract price
费用的估价The cost estimate
证明材料Materials of proof。