capacity , diameter , and depth ; the type of
shaft lining ; the main pipelines and cables ;
number and functions of shaft insets ; the
depth of the shaft sump ; and the quantity of
• 根据矿井的深度,竖井的施工可能占矿山基建总工 期的60%。
• Because of this , a proper choice of a method to minimize sinking time and assure uninterrupted operation is of great importance .
• 竖井设计的技术资料包括项目设计概述和竖 井大致位置的确定。
06:28:53
6
• The outline of the shaft project should contain a section describing its purpose and justifying selection of the shaft site .
• 在确定竖井的直径和提升高度时(后者对于急倾斜 或多层矿床尤其重要),要考虑超出第一开采阶段 以外矿体的后续开采。
06:28:53
3
• Generally speaking , it is better to overdesign the shaft in the first stage of the project life span than later to face a bottleneck , preventing an otherwise feasible increase of production or req来自百度文库iring the sinking of second shaft .
• 因此,选择一个合适的施工方式来保证凿井工期最 短和确保不间断的作业是非常重要的。
06:28:53
2
• In determining the shaft diameter and hoisting depths (the latter especially for three dimensional or multi-seam deposits) , future mining needs have to be evaluated beyond the first stage of the project .
airflow through the shaft , with corresponding
drawing and cost specifications .
• 设计概述还应该包括该竖井特点及功能;提升装置; 提升能力,直径,和井深;井筒支护类型;主要的
管道和电缆;竖井装备的数量及功能;井底水仓的
深度;通风量,相应的技术图纸和技术经济指标的 简要描述。
• 竖井工程的设计概述应该包含竖井的用途的 描述并说明选择的该竖井位置点的理由。
06:28:53
7
• Also included in the outline should be a short
description of the characteristics of the shaft
and its function ; the hoisting gear ; the shaft
• Shafts are the most important capital openings of deep mines , providing all services for underground operations including fresh air , transportation of ore and supplies , personnel traffic , power ( electricity and compressed air ) , communications , water supply , and drainage .
06:28:53
8
• Excavation design requires the gathering of pertinent data and solving particular elements of the design , the most important of which are :
• 一般情况下,最好在项目第一开采阶段的使用期限 内超深设计竖井,以防止遇到因后期可能的扩产或 者需要掘进另外一条竖井所带来的难题。
06:28:53
4
• If shaft extension is foreseen , part of the area in the shaft cross section can be used for this operation without affecting operation of the shaft , serving production from any upper levels .
• 竖井是深部矿床开采最重要的进出口,提供地下生 产作业的所有服务,包括通风、矿石和材料的运输、 人员交通、电力(电和压缩空气)、通信、供水、排水。
06:28:53
1
• Depending on the depth of the mine , shaft sinking may consume as much as 60% of the mine development time .
• 如果竖井的延深是可以预见的,那么在不影响竖井 的正常运作,不影响它为任何上中段生产水平生产 服务的情况下,竖井横截面的部分区域可以用作竖 井延深施工的空间。
06:28:53
5
• Technical data required for the design of the shaft consists of a project outline and determination of the approximate shaft location .