工程量自动计算表
- 格式:xls
- 大小:55.00 KB
- 文档页数:2
面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米115731.3031.3031.3031.3031.3031.3130.1030.000.000.01-1.20-1.300.6235.0045.4397.88225731.3031.3031.3031.3031.3031.3030.1030.000.000.00-1.20-1.300.6335.0046.2098.58335731.6531.6531.3031.6031.3031.3031.0031.00-0.35-0.35-0.30-0.600.4035.000.0014.00445731.6531.6531.5031.5031.3031.3031.0031.00-0.35-0.35-0.50-0.500.4335.000.0014.88555531.3031.3031.3031.3030.1030.1030.1030.10-1.20-1.20-1.20-1.20 1.2025.000.0030.00665531.3031.6031.3031.6030.1031.0030.1031.00-1.20-0.60-1.20-0.600.9025.000.0022.50775531.3031.6031.3031.6031.0031.0031.0031.00-0.30-0.60-0.30-0.600.4525.000.0011.25885531.6031.6031.6031.6031.0031.0031.0031.00-0.60-0.60-0.60-0.600.6025.000.0015.00995531.3031.3031.0531.0530.1030.1030.2030.20-1.20-1.20-0.85-0.85 1.0325.000.0025.6310105531.3031.6031.0531.6030.1031.0030.2030.90-1.20-0.60-0.85-0.700.8425.000.0020.9411115531.3031.6031.0530.3531.0030.7530.6530.65-0.30-0.85-0.400.300.3125.000.147.3212125530.6030.6031.3531.3531.0031.0030.9030.900.400.40-0.45-0.450.0325.00 2.35 2.9813135531.0531.0531.0531.0530.2030.2030.2030.20-0.85-0.85-0.85-0.850.8525.000.0021.2514145531.0531.3531.0531.3530.2030.9030.2030.90-0.85-0.45-0.85-0.450.6525.000.0016.2515155531.3531.3531.3531.3530.9030.9030.9030.90-0.45-0.45-0.45-0.450.4525.000.0011.2516165531.3531.3531.3531.3530.9030.9030.9030.90-0.45-0.45-0.45-0.450.4525.000.0011.2517175531.0531.0531.0531.0530.2030.2030.2030.20-0.85-0.85-0.85-0.850.8525.000.0021.2518185531.0531.3531.0531.3530.2030.9030.9030.90-0.85-0.45-0.15-0.450.4825.000.0011.8819195531.3531.3531.3531.3530.9030.9030.9030.90-0.45-0.45-0.45-0.450.4525.000.0011.2520205531.3531.3531.3531.3530.9030.9030.9030.90-0.45-0.45-0.45-0.450.4525.000.0011.2521215531.0530.7031.0530.7030.2030.2030.2030.20-0.85-0.50-0.85-0.500.6825.000.0016.8822225531.0530.7031.0530.7030.2030.9030.9030.90-0.850.20-0.150.200.1525.000.29 5.5423235531.3531.0031.3531.0030.9030.0930.6530.65-0.45-0.91-0.70-0.350.6025.000.0015.0624245531.3531.0031.3531.0030.6530.6530.9030.90-0.70-0.35-0.45-0.100.4025.000.0010.0025255530.7030.7030.7030.7030.2030.2030.2030.20-0.50-0.50-0.50-0.500.5025.000.0012.5026265530.7030.7030.7030.7030.2030.2030.2030.20-0.50-0.50-0.50-0.500.5025.000.0012.50完 成 标 高原 始 标 高方格内平均高度施 工 高 度商业街序号方格编号方格网边长面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米完 成 标 高原 始 标 高方格内平均高度施 工 高 度序号方格编号方格网边长面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米完 成 标 高原 始 标 高方格内平均高度施 工 高 度序号方格编号方格网边长面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米完 成 标 高原 始 标 高方格内平均高度施 工 高 度序号方格编号方格网边长面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米完 成 标 高原 始 标 高方格内平均高度施 工 高 度序号方格编号方格网边长面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米完 成 标 高原 始 标 高方格内平均高度施 工 高 度序号方格编号方格网边长面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米完 成 标 高原 始 标 高方格内平均高度施 工 高 度序号方格编号方格网边长面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米完 成 标 高原 始 标 高方格内平均高度施 工 高 度序号方格编号方格网边长面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米完 成 标 高原 始 标 高方格内平均高度施 工 高 度序号方格编号方格网边长面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米完 成 标 高原 始 标 高方格内平均高度施 工 高 度序号方格编号方格网边长面积:平方米立方米立方米面 积挖方体积填方体积A B 第一点第二点第三点第四点第一点第二点第三点第四点第一点第二点第三点第四点平方米立方米立方米完 成 标 高原 始 标 高方格内平均高度7340.00施 工 高 度挖方量:1390.03填方量:9516.64序号方格编号方格网边长第 11 页,共 11 页。
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉
钢 筋 计 算 稿工程名称:干粉砂浆生产线土建工程--烘干炉。
项目名称:序号分部分项名称及部位一泵房1 垫层砼2 垫层模板3 底板砼4 底板模板单位合计备注(13.25*2+0.1*2 )* (0.1+0.5+2.5+1.55 )+(13.25*2+1.25*2+1.1*2+0.1*2 )*(3+2.5 )+(1.25+1.1 )*4*0.1+ (()*(13.25*2+0.1*2)+m3#NAME?(13.25*2-0.674 )+0.1*2 )*1.852+ ((( 13.25*2-2*0.674+ (12.8+2 ))2*2/2* (3+2.5 )m3 #NAME?13.25*2+2*0.1+ ()(m2 #NAME?2.752 )*2+9.79*213.25*2* (9.798+1.75 )*1.2+1.85* (13.25*2-0.674 )*1.2+ (13.25*2+19.8 )/2*11.6*4.124/4*1.2+ (3.92+0.5 )*19.8*1.3+ (2.08+10.5+2.8 )m3 #NAME?(1.25+1.1 )*5.5*1.2*2 m3 #NAME?(13.25*2+ (0.5+2.5+0.55 )*2+(( 3+2.5 )*2+(9.798-6.05 )*2+9.79*2+2.752*2 )*1.2+ (( 3.992+0.5 )*2*1.3 )+(( 2.008+6)m2#NAME?(12.8+7 )*1.5 ))二水泵吊装井5 J-11 9-9 ()*2 m3 #NAME?2.1* ()*23.5-0.9*2.25*3.1*6 m3 #NAME?6 J-10m2 #NAME?项目名称:序号分部分项名称及部位7762.2 处8767.2-769.3 段砼9767.2-769.3 段模板10769.3-773 段三顶部砼LL1 14 根砼LL2 12 根单位合计备注(767.2-754.7 )m3 #NAME?12.5*23.5+ ()m2 #NAME?3.14*1.8* ()m2 #NAME?(769.3-767.2 )*3.65*23.5-1.4*1.8*6-3.14*0.9*0.9* ()+m3 #NAME?(1+0.5 )/2* (1.55-0.35 )*23.5+ (1.2+0.5 )*3.25/2* ()(0.5+3.25 )*4.85+ (0.5+1.25 )m3 #NAME? (769.3-769.2 )*3.14*1.8*6 m2 #NAME?(1.4+1.8 )*2*1.5*6+ ()+(2.1*3.35*2 )m2 #NAME?()m3 #NAME?()*2*2*3.2+ (4.1+0.6 )*2*3.2+ (4.1*2*2 )m2 #NAME?m3 #NAME?m3 #NAME?顶板砼项目名称:序号分部分项名称及部位模板 LL1 模板模板 LL2 模板顶模板四小泵井砼井筒顶板模板井筒模板顶板模板五进水池及前池单位合计备注(0.2*2+0.25 )*4.2*14+2.5*0.2*2*6+ (0.4*2+0.25*4.2*2 )m2 #NAME?(0.35+0.25+0.15 )*2.5*2*6 m2 #NAME?(1.3*4.2+1.85*4.2 )*2+(22-6*3 )* (0.95*0.25 )m2 #NAME?(3+2.6+0.45*2 )*2*0.45* (771.65-752.7 )- (763.2-752.7 )* (3+0.45 )m3 #NAME?0.95* (1.71+1.4+0.15*2 )m3 #NAME?(( 3.9*3.5 )- (1.71*1.4 ))m3 #NAME? (771.85-752.7 )* (( 3.9+3.5 )*2+(2.6+3 )*2 )m2 #NAME?0.95* (( 1.7+1.4 )*2+(2.01+1.7 )*2 )m2 #NAME?3*2.6- (1.71*1.4 )m2 #NAME?进水池m#NAME? 前池m#NAME?项目名称:序号分部分项名称及部位砼模板腋角砼腋角模板顶板砼顶板模板柱一砼柱一模板柱二砼柱二模板六格栅井砼壁壁模板单位合计备注(1.85+8.55 )m3 #NAME?(1.85+8.55 )m2 #NAME?0.5*0.5/2* (3.55+3.55+3.65+3.65+3.55*2+ (9.798-3.05 )*2+12.72*2+m3 #NAME?(1.85+8.55+12.1 )*2 )0.707* (3.55+3.55+3.65+3.65+3.55*2+ (9.78-3.05 )*2+12.72*2+m2 #NAME?(1.85+8.55+12.1 )*2 )(13.25-2.5 )*2* ()*0.4+ (( 2.4+1+2.5+0.5 )*2+()#NAME?*2 )* (10.1+1.852 )m3(9.798-3.05 )* (3.65+3.55+3.55 )+(( 2.41+1+2.5 )*2+m2 #NAME?(3.65+3.55+3.55 )*2 )* (1.852+10.1 )/2+0.5* (2.4+1+2.5 )*2-1.6*1.6*22(1.6*1.6*0.2+1.6*1.6*0.6+0.309*2+ (( 762.9-754.7 )-1 )*0.36 )m3 #NAME?(1.6*4*0.2+0.6*4*7.2+1.6*4*0.2+ (0.7+1.3 )/2*1.14*0.3*4*2 )*12 m2 #NAME?(0.2+0.6 )*1.6/2*1.6*10+0.309*10+1.6*1.6*0.6*10+0.39*10+0.6*0.6*m3 #NAME?(7.2-0.675 )*4+0.6*0.6* ()*4+0.6*0.6* ()*2(1.6*0.2+1.6*0.6+0.4*1.6*2 )*10+(0.7+1.3 )#NAME?/2*1.14*0.3*10+1.6*4*0.2*10+ (7.2-0.675 )*0.6*4+ ()*0.6*4+ m2(7.2-2.275 )*0.6*49.1* (6.4*2 )*0.5+7*0.8*9.1+7*1*3*4.7+10.1*6*1*3+0.5*0.5*4*7+4.7*7*1*2 m3 #NAME?(6.4*2+0.8*2 )*9.4+ (7*2*9.4 )+7*2*5.7+12.8* (6+8)+项目名称:序号分部分项名称及部位顶板砼顶板模板WKL6砼WKL6模板七进水渠壁砼壁模板支柱砼支柱模板顶板砼顶板模板单位合计备注(6* ()- ()*2 )m3 #NAME?6* (2.75+3.65+3.65+2.75-3 )- ()*2+(( 2.2+2.5 )m2 #NAME?*2*0.3*2+ (2.2+2.4 )*2*0.3*2 )0.5*1* (0.8+2.75+3.65 )*2 m3 #NAME?()* (2.75+3.65 )*2 m2 #NAME?m3 #NAME?5.1*4.9+ (5.1-0.4 )m2 #NAME?()*2 m3 #NAME?(1.6*4*0.2*2+ (0.6+1.3 ))*2 m2 #NAME?m3 #NAME?12.8*4.9-1.6*1.6*2-4.9*1 m2 #NAME?八进水闸门井项目名称:序号分部分项名称及部位壁砼壁模板顶板砼顶板模板九扶壁柱一柱砼柱模板扶壁柱二单位合计备注(12.8+1.2 )*2* (12+2.9 )*0.6+ (12+2.9 )()+0.5*0.5*12.8+4.5*0.5*0.5+ m3 #NAME?(2.2*2*0.6*12+3.2*0.6*12+0.3*0.3/2* (1.6*2+3.2*2 ))1.28*4* (12+2.9 )+5.1* (12+2.9 )*2+4.5*2.9*2- (2.5*3.2+4*2.5*2.2*2+m2 #NAME?(1.6*2+3.2 )*12+(2.2*2+4.4 )*12)(4.5+1.2 )* (12.8+1.2 )m3 #NAME?m2 #NAME?1.5*1*5.9*2+1.5*1*5.7*4 m3 #NAME?2* (1.5*2+1 )*5.9+ (1.5*2+1 )*5.7*4 m2 #NAME?柱砼(1.5*0.8 )*5.5*2+ (1.5+0.3 )m3 #NAME? 柱模板(1.5*2+0.8 )*5.5*2+ (1.5+0.3 )*9.4/2*2+0.8*9.48*2 m2 #NAME? 扶壁柱三柱砼(0.3+1.5 )m3#NAME?项目名称:序号分部分项名称及部位单位合计备注柱模板(1.5+0.3 )m2 #NAME?十压力井(1)压力出水渠垫层砼(1.8+0.5+0.2 )*0.1*10.07*6 m3 #NAME?垫层模板m2 #NAME?底板砼10.07* (1.8+0.5 )m3 #NAME?壁砼10.07*2*0.25*1.6*6 m3 #NAME?壁模板(( 1.4+0.3+0.2 )*10.07*2+1.4*10.07*2 )*6 m2 #NAME?顶板砼m3 #NAME?顶板模板10.07*1.8*6 m2 #NAME?(2)压力井出水井垫层砼m3 #NAME?垫层模板m2#NAME?项目名称:序号分部分项名称及部位底板砼底板模板壁砼壁模板顶板砼顶板模板L-2 砼梁模板预埋钢管 D219*6 十一出水闸门井垫层砼垫层模板单位合计备注m3 #NAME?m2 #NAME?m3 #NAME?3.14*0.9*0.9*0.4*3m2 #NAME?1.4*1.8*2*6-3.14*0.9*0.9*2*34* (22.05-0.4*4 )*0.2-2.2*1.2*0.2*6 m3 #NAME?4* (21.2-0.4*2 )-2.2*1.2*6 m2 #NAME?m3 #NAME?(0.3+0.35*2 )*22+1.2*0.2*2*6 m2 #NAME?0.4*3 m #NAME?#NAME?m3#NAME?(8.4+23.2 )m2项目名称:序号分部分项名称及部位底板模板壁砼壁模板顶板砼顶板模板预制顶板砼预制顶板模板L-1 梁砼梁模板J-1 基础砼基础模板J-2 基础砼单位合计备注#NAME?(23+8.2 )m2#NAME?0.4* (22*2*5+6.4*2*5 )- ()m3#NAME?22*2*5+21.2*2*5+6.4*4*5-6*2*3.14*0.9*0.9-3.14*0.6*0.6*2 m2#NAME?7.2* (1.7+0.4 )*0.2*2m3#NAME?m2#NAME?m3#NAME?m2#NAME?m3#NAME?6.4* (0.25+0.35*2 )*2m2#NAME?m3#NAME?(0.6+0.8 )*2*0.75*12m2#NAME?m3#NAME?项目名称:序号分部分项名称及部位ZD-1基础砼基础模板预制井筒十二阀门井垫层垫层模板底板砼底板模板壁砼壁模板顶板砼顶板模板单位合计备注#NAME?m3#NAME?(1.2+1.2 )*2*1.1*4m2#NAME?m#NAME?m3#NAME?(3.6+3.7 )m2#NAME?m3#NAME?(3.5+3.6 )m2#NAME?()m3#NAME?(3+3.1 )*2*3.1+ (2.5+2.6 )*2*3.1-0.25*0.25*3.14*4*2 m2#NAME?m3#NAME?(3+3.1 )m2#NAME?项目名称:序号分部分项名称及部位J1垫层垫层模板J1基础基础模板柱砼柱模板J2垫层垫层模板J2基础基础模板柱砼柱模板J3垫层单位合计备注#NAME?(1.95*2+0.2 )* (1.95*2+0.2 )m3#NAME?(1.95*2+0.2 )m2#NAME?(1.95*2 )* (1.95*2 )m3#NAME?(1.95*2 )m2#NAME?m3#NAME?m2#NAME?(1.95*2+0.2 )* (1.95*2+0.2 )m3#NAME?(1.95*2+0.2 )m2#NAME?(1.95*2 )* (1.95*2 )m3#NAME?(1.95*2 )m2#NAME?m3#NAME?m2#NAME?(1.45*2+0.2 )* (1.45*2+0.2 )m3项目名称:序号分部分项名称及部位垫层模板J3基础基础模板柱砼柱模板J4垫层垫层模板J4基础基础模板柱砼柱模板J5垫层垫层模板单位合计备注#NAME?(1.45*2+0.2 )m2#NAME?(1.45*2 )* (1.45*2 )*0.3+ (1.6*1.6 )m3#NAME?()+()m2#NAME?m3#NAME?m2#NAME?(1.45*2+0.2 )* (1.45*2+0.2 )m3#NAME?(1.45*2+0.2 )m2#NAME?(1.45*2 )* (1.45*2 )*0.3+ (1.6*1.6 )m3#NAME?()+(16*4*0.3)m2#NAME?m3#NAME?m2#NAME?(1.55*2+0.2 )* (1.55*2+0.2 )*0.1*3 m3#NAME?(1.55*2+0.2 )*4*0.1*3 m2项目名称:序号分部分项名称及部位J5基础基础模板柱砼柱模板J6垫层垫层模板J6基础基础模板柱砼柱模板J7垫层垫层模板J7基础单位合计备注#NAME?(( 1.55*2 ))*0.3+ ()*3 m3#NAME?(( 1.55*2 )* (1.55*2 )*0.3 )*3 m2#NAME?m3#NAME?m2#NAME?m3#NAME?m2#NAME?()*2 m3#NAME?()*2 m2#NAME?m3#NAME?m2#NAME?m3#NAME?m2#NAME?m3项目名称:序号分部分项名称及部位基础模板柱砼柱模板J8垫层垫层模板J8基础基础模板柱砼柱模板J9垫层垫层模板J9基础基础模板单位合计备注#NAME?m2#NAME?m3#NAME?m2#NAME?m3#NAME?m2#NAME?m3#NAME?m2#NAME?m3#NAME?m2#NAME?m3#NAME?m2#NAME?m3#NAME?m2项目名称:序号分部分项名称及部位柱砼柱模板十四外墙基础C15砼基础基础模板砖基础地圈梁圈梁模板外墙砌筑内墙砌筑女儿墙砌筑顶板砼顶板模板单位合计备注#NAME?m3#NAME?5.8*0.4*4 m2m3#NAME?m373.05*0.3*2+103.*0.3*2+5.45*0.3*2#NAME?m2#NAME?m3#NAME?m368.8*0.24*2+10.3*0.24*2+5.45*0.24*2#NAME?m273.05*0.3* (4.5-0.7 )- ()#NAME?m3(( 10.3+5.45 )* (4.5-0.7 )-1*2.1 )#NAME?m368.8*0.12*05#NAME?m3#NAME?m3#NAME?m2项目名称:序号分部分项名称及部位KL1砼KL1模板KL2砼KL2模板KL3砼KL3模板KL4砼KL4模板KL5砼KL5模板KL6砼KL6模板KL7砼单位合计备注#NAME?(6.2-0.4 )(4-0.4 )m3#NAME?(6.2-0.4 )()m2#NAME?(10.2-0.6 )m3#NAME?(10.2-0.6 )()m2#NAME?(10.2-0.6 )m3#NAME?(10.2-0.6 )()m2#NAME?()m3#NAME?()()m2#NAME?(6.2-0.4 )(4-0.4 )m3#NAME?(6.2-0.4 )()m2#NAME?(( 23.4-0.4-0.5*3))*2m3#NAME?(( 23.4-0.4-0.5*3))*2m2#NAME?(23.4-0.4-0.4*3)m3项目名称:序号分部分项名称及部位KL7模板L1-L8砼L1-L8模板L9-L10-L11 砼L9-L10-L11 模板顶板保温顶板防水外墙抹面内墙抹面地墙十五水泵控制间垫层砼垫层模板单位合计备注#NAME?()()m2#NAME?()m3#NAME?()*0.45*2+()m2#NAME?()m3()*0.45*0.3+ ()#NAME?m2()* ()#NAME?m2()* ()+()#NAME?m2(( 23.4+0.4 )+(10.2+0.4 )) *2*5#NAME?m2#NAME?m2(23.8-0.62 )* (10.6-0.6 )#NAME?m3#NAME?m3#NAME?45.6*0.1*2+4.55*0.1*2 m2工程量计算表项目名称:序号分部分项名称及部位平基砼平基模板柱KE1砼柱KE1模板WKL1砼WKL1模板WKL2砼WKL2模板顶板砼顶板模板挑檐砼挑檐模板圈梁砼单位合计备注#NAME?(1*0.25+ (0.3+1 ))* (45.6+4.55 )m3#NAME?(0.45*2+0.35*2+0.25*2)*()m2#NAME?(778-772)* (4+6)m3#NAME?(6-0.1 )* (0.45*4 )*10-0.4*0.25*2*2-0.4*0.25*2*3-0.3-0.25*2*4 m2#NAME?(17.6+0.45 )*2*0.25*0.35+5.2*0.25*0.4*4 m3(17.6+0.45 )*2*0.35+ (17.6-5*0.45 )*0.25*2- ()#NAME?*0.3*2+5.2*0.25*4+5.2*0.35*2*4 m25.2*0.25*0.4*5#NAME?m3(5.2-0.45 )*2* (0.4+0.4+0.25 )*5#NAME?m2#NAME?m3(6.65+17.6+0.725*2)*2*0.1+6.65*(17.6+0.725*2)-10*0.45*0.45-5.2*0.25*5- #NAME?m2(( 17.6+0.725*2 )+6.65 )*0.08*0.5*2+ (17.6+0.725*2 )*0.5*0.1*2+ #NAME?(5.5+0.225*2 )*0.5*0.1*2+ (5.2+0.725*2 )*0.5*0.08*2 m3(17.6+0.725*2 )*0.5*2*2+ (17.6+0.725*2 )*0.5*2+ (5.2+0.725*2 )#NAME?*0.5*2*2+ (5.2+0.225*2)*0.5*2 m2#NAME?m3项目名称:序号分部分项名称及部位圈梁模板基础砖砌外墙砖砌外墙粉内墙粉柱粉顶粉顶板保温顶板防水十六传达室L外L中L内中工程量计算表单位合计备注#NAME?m2#NAME?m3#NAME?m3#NAME?51.4*0.5+ (5.2+0.45+17.6+0.45 )*2*4.9-6*1.8*2.1-1.8*2.4*2 m2#NAME?(5.2+17.6 )m2#NAME?()m2(2.2-0.25 )*5.2*8+5.2* (0.25+0.4*2 )*7#NAME?m2(6.65-0.008*2 )* (17.6+0.725*2-0.08*2 )#NAME?m2(6.65-0.8*2 )* (17.6+0.725*2-0.08*2 )+(( 17.6+0.725*2 )+6.65 )#NAME?m2#NAME?(7.7+5.6 )*2#NAME?(7.7-0.185*2+5.6-0.185*2)*2#NAME?工程量计算表项目名称:序号分部分项名称及部位L内净基础M715MU30浆砌片石砖砌放大角部分底圈梁单位合计备注#NAME?(( 3.6-0.12 )*2+(5.6-0.12 )*2 )*2#NAME?#NAME?()#NAME?#NAME?#NAME?#NAME?#NAME?#NAME?#NAME?。
工程量计算表使用说明:表中【计算公式】列输入计算过程,但计算结果自动在【数量】列显示,此功能支持计算粘贴。
注意:*文档打开时提示是否使用宏,要选择是*。
使用时不要将【数量】列的单元格内自动计算表达公式“=IF(ISERROR(JS),"",ROUND(JS,2))”删除,否则就不可以用了。
表达式中的2为小数点保留位数,可根据需要调整位数如0,1,3等。
工程量计算表使用说明:表中【计算公式】列输入计算过程,但计算结果自动在【数量】列显示,此功能支持计算粘贴。
注意:*文档打开时提示是否使用宏,要选择是*。
使用时不要将【数量】列的单元格内自动计算表达公式“=IF(ISERROR(JS),"",ROUND(JS,2))”删除,否则就不可以用了。
表达式中的2为小数点保留位数,可根据需要调整位数如0,1,3等。
工程量计算表使用说明:表中【计算公式】列输入计算过程,但计算结果自动在【数量】列显示,此功能支持计算粘贴。
注意:*文档打开时提示是否使用宏,要选择是*。
使用时不要将【数量】列的单元格内自动计算表达公式“=IF(ISERROR(JS),"",ROUND(JS,2))”删除,否则就不可以用了。
表达式中的2为小数点保留位数,可根据需要调整位数如0,1,3等。
工程量计算表使用说明:表中【计算公式】列输入计算过程,但计算结果自动在【数量】列显示,此功能支持计算粘贴。
注意:*文档打开时提示是否使用宏,要选择是*。
使用时不要将【数量】列的单元格内自动计算表达公式“=IF(ISERROR(JS),"",ROUND(JS,2))”删除,否则就不可以用了。
表达式中的2为小数点保留位数,可根据需要调整位数如0,1,3等。
工程量计算表使用说明:表中【计算公式】列输入计算过程,但计算结果自动在【数量】列显示,此功能支持计算粘贴。
注意:*文档打开时提示是否使用宏,要选择是*。
工程量自动计算表公式一、土方工程。
1. 长方体(棱柱体)基础土方量。
- 公式:V = a× b× h(V为土方体积,a为基础底面长,b为基础底面宽,h为挖土深度)- 例如:一个基础底面长为5m,宽为3m,挖土深度为2m,则土方量V =5×3×2= 30m^3。
2. 棱台(放坡基础)土方量。
- 公式:V=(1)/(3)h(S_1 + S_2+√(S_1)S_{2})- 其中h为棱台高(挖土深度),S_1为棱台上底面积,S_2为棱台下底面积。
- 假设棱台上底边长a_1=2m,b_1=1m,下底边长a_2=4m,b_2=3m,挖土深度h = 3m。
- 则S_1=a_1× b_1=2×1 = 2m^2,S_2=a_2× b_2=4×3=12m^2。
- V=(1)/(3)×3×(2 + 12+√(2×12))- 先计算√(2×12)=√(24) ≈ 4.9- 则V=(1)/(3)×3×(2 + 12 + 4.9)=18.9m^3二、混凝土工程。
1. 矩形柱混凝土量。
- 公式:V = a× b× h(V为柱混凝土体积,a为柱底面长,b为柱底面宽,h为柱高)- 例如:柱底面长0.5m,宽0.4m,高3m,则V = 0.5×0.4×3 = 0.6m^3。
2. 梁混凝土量(矩形梁)- 公式:V = l× b× h(V为梁混凝土体积,l为梁长,b为梁宽,h为梁高)- 若梁长6m,宽0.3m,高0.6m,则V = 6×0.3×0.6 = 1.08m^3。
三、砌体工程。
1. 砖墙砌体工程量。
- 公式:V=(L× H - ∑_i = 1^nS_i)× b- 其中L为墙长,H为墙高,S_i为门窗等洞口面积(n为洞口个数),b为墙厚。