公路工程施工工艺流程图
- 格式:doc
- 大小:161.50 KB
- 文档页数:17
三级公路的施工流程图英文回答:The construction process of a tertiary highway involves several steps and can be quite complex. Here, I willoutline the general flow of the construction process.1. Planning and Design:The first step in constructing a tertiary highway is the planning and design phase. This involves conducting surveys, studying the terrain, and determining the best route for the highway. Engineers and architects work together to create detailed plans and blueprints for the construction.For example, when I was involved in the construction of a tertiary highway in my area, we conducted soil tests and surveyed the land to identify any potential obstacles or challenges. We then used this information to design themost suitable route for the highway.2. Preparing the Site:Once the planning and design phase is complete, the next step is to prepare the construction site. This involves clearing the land, removing any existing structures or obstacles, and leveling the ground.In my experience, we had to remove trees, rocks, and other debris from the site before we could start the construction. We also had to ensure that the ground was properly leveled to provide a stable foundation for the highway.3. Building the Foundation:After the site preparation, the construction crew begins building the foundation for the highway. This typically involves excavating the ground, compacting the soil, and laying a layer of gravel or crushed stone.During the construction of the tertiary highway I worked on, we used heavy machinery to excavate the ground and compact the soil. We then added layers of crushed stone and compacted them to create a solid foundation.4. Constructing the Road Surface:Once the foundation is complete, the construction crew moves on to building the road surface. This involves laying asphalt or concrete and ensuring that it is properly leveled and compacted.In my experience, we used asphalt to construct the road surface. We laid the asphalt in layers, compacting each layer to ensure a smooth and durable road surface. We also added road markings and signage to ensure safety for drivers.5. Installing Infrastructure:In addition to the road surface, a tertiary highway also requires the installation of various infrastructureelements. This includes drainage systems, lighting, guardrails, and signage.During the construction of the tertiary highway I was involved in, we installed drainage pipes along the sides of the road to prevent water accumulation. We also installed streetlights and guardrails to enhance safety. Additionally, we placed road signs and markings to guide drivers.中文回答:三级公路的施工流程包括几个步骤,可能会相当复杂。
公路工程施工工艺流程图完整版公路工程:施工工艺流程图:在公路工程中,施工工艺流程图是非常重要的。
在该流程图中,设计单位、业主、监理和承包人都需要参与其中,以确保施工的正确性和高效性。
其中,桩志的复核和资料的校验都需要监理工程师的审查和批准。
混合料配合比施工工艺流程图:混合料配合比施工工艺流程图是公路工程中的重要部分。
其中,材料的筛分和试验,以及混合料的击实试验和抗压强度的检测都需要报送监理工程师审查批准。
如果不合格,则需要修筑试验路,并再次检测,直到合格为止。
沥青砼面层(底、中、表)施工工艺流程图:沥青砼面层施工工艺流程图也是公路工程中的重要部分。
其中,原材料的试验和配合比的确定,以及现场机械设备的配备和运转都需要监理工程师的审查和批准。
在施工过程中,监理工程师需要旁站并监督施工过程,审核承包人的检测资料,并进行独立抽查试验。
路基工程施工工艺流程图:路基工程施工工艺流程图包括施工准备阶段和施工放样阶段。
在施工准备阶段,需要编制路基施工工艺流程,移交土地所有权,以及确定取土场。
在施工放样阶段,需要进行路线中线和边线的放样,以及涵洞中线交角的放样。
同时,还需要增补控制点和水准点。
承包人完成自检后,可以申请单项工程开工,开始路基范围内的清理场地和填前压实工作。
在确定机具组合、最佳含水量和最佳碾压遍数之后,进行试验路段的压实工作。
报送清理与压实工序报验单和自检合格报验单后,开始路基施工阶段的工作。
在运土(从取土场或利用土)和控制含水量的过程中,监理旁站进行监督,同时进行摊铺、整平和碾压等工作。
承包人需要自检压实度并报送工序报验单,待工程验收后进行恢复桩志、详细放样和路槽整平加工等工作。
最后,报送分项工程报验单及归档资料整理全部检测资料和施工原始记录。
在编报阶段施工工艺流程图中,需要申报开工报告并进行施工放样。
承包人需要报送放样资料、图纸和申请开工路基施工。
在进行原地面清理、原地面压实、土料场确定和分层取土样试验之后,需要报送填前压实工序报验单和土料场土样结构物的申请阶段检验。
路基工程施工工艺及流程图Document serial number【KKGB-LBS98YT-BS8CB-BSUT-BST108】路基工程施工工艺及流程图(史上最全)1前期准备工作<1>路基开工前,首先要进行测量定线工作,其内容包括导线、中线、水准点复测、断面检查与补测。
测量精度以交通部颁布的《公路路线勘测规程》的要求为标准。
测量的工具,使用精度符合要求的全站仪,红外线测距仪,经纬仪和水准仪。
当导线点与水准点不能满足施工要求时,报监理工程师批准,对其进行加密,成果资料提交监理工程师审查后签字认可后使用。
在开工前进行施工放样,放出路基边缘、坡口、坡脚、边沟护坡道、借土场等具体位置,标明其轮廓,报监理工程师检查批准。
对工程沿线及借土场应取有代表性的土样,按JTJ051-93标准试验方法,进行天然液限、塑性指数、密度、含水量等的试验。
用于填方的土样,测量最大干容性、最佳含水量或毛体积比重和土的加州承载比GBR值,测试结果报监理工程师审批。
<2>清理掘除。
在路线用地范围内的树木、杂草、灌木等应予清除,按照监理工程师指定的深度和范围清除并运至工程师指定地点,路基用地范围内的结构物按要求清除,对于路基附近的危险建筑予以适当加固,对文物古迹妥善保护。
路基表面清理完工后,并根据规范的要求进行填前碾压并达到监理工程师的规定要求。
挖方或填方区域内,所有的腐植土、淤泥、表层植土均应挖出干净,按环保规定弃置路基范围用地以外,并按《公路路基施工技术规范》弃土条例要求处理,对因挖出孔穴、障碍物而留下的孔洞、树根按要求进行处理。
2路基的填筑方法路基宜采用水平分层填筑,即按照横断面全宽分成水平层次,逐层向上填筑。
如果原地面不够平坦,填筑应从最低处分层填起,每填一层经过压实达到符合规定要求后,再添一层。
对于原路面纵坡大于12%的地段。
可采用纵向分层填筑法施工,沿纵坡逐层、分层填压达到密实。
但填之路堤的上部,仍采用水平分层填筑法。
施工工艺框图1、路基填筑施工程序框图2、路基开挖施工程序框图3、路基石方开挖(爆破法)施工工艺框图4、盖板涵施工程序框图5、圆柱墩施工工艺框图6、盖梁施工工艺框图7、后张法预应力梁板施工工艺框图8、梁板架设施工工艺框图9、隧道新奥法施工工艺流程框图10、喷锚支护施工程序框图11、喷射混凝土施工程序框图12、光面爆破施工工艺流程图13、防水板铺设施工工艺流程图14、二次衬砌施工程序框图15、超前地质预报探测施工程序图1、路基填筑施工程序框图路基填筑施工程序框图施工准备清表、基底处理分层填土 摊铺、整平土粒粒径检测含水量检测精 整机械碾压压实度检测 下道工序施工 原地面高程复测开工报告编制土工击实试验土料颗粒、液塑试验按规定数量上土松铺厚度检测翻松、破碎翻 晒纵、横坡符合要求洒水闷料W P <0.98W 最佳0.98W 最佳≤W P ≤1.02 W 最佳0.98W 最佳≤W P ≤1.02 W 最佳W P >1.02W 最佳大于8cm小于8cm路基填筑施工程序框图文字说明1、试验段的设置在监理工程师批准的路段修筑100米的试验段。
填筑材料在使用前7天将试验结果报送总监代表。
试验段施工程序与路基填筑施工方法一样。
2、基底压实路基清表后,用压路机进行基底整平压实。
3、测量放样路基放样时,根据设计图放出路堤坡脚、路堑坡顶、边沟等具体位置,以定出路基轮廓。
在路堤坡脚处缘每隔20cm一竹片桩,桩上注明桩号,定出路堤坡脚线。
4、分层填筑路堤采用水平分层填筑,松铺厚度控制在30cm以内。
每极限填土石高度作为一个施工土层,每1.5m土高度打一根竹片桩,定出边坡坡度,每一个施工土石层分30cm进行水平分层填,用40t激振力压路机分若干次压实(确切的压次数按压试验要求确定),如此一直填筑至设计标高。
分层填筑要形成路基横坡,横坡度为2%~3%,以利排水。
5、分层整平、分层压实(分层检测)整平过程中,不断检查表面高程。
刮平时“宁高勿低”,严禁“薄层贴补”,避免造成表面松散、起皮等不良后果。
三级公路的施工流程图英文回答:The construction process for a tertiary highway involves several steps to ensure the successful completion of the project. Here is a simplified flowchart outlining the key stages:1. Planning and Design:Conduct a feasibility study to determine the needfor the tertiary highway and its alignment.Prepare detailed engineering designs, including road alignment, cross-sections, and drainage systems.2. Land Acquisition and Clearing:Acquire the necessary land rights through negotiations or legal procedures.Clear the land from any existing structures, trees, or vegetation that may obstruct the highway construction.3. Earthwork and Grading:Excavate and remove the topsoil to reach thesuitable subgrade.Grade the subgrade to achieve the desired road profile and cross-section.4. Subbase and Base Construction:Place and compact a layer of suitable materials, such as crushed stones or gravel, to form the subbase.Construct the base layer using materials like crushed aggregate, asphalt, or concrete to provide a stable foundation for the pavement.5. Pavement Construction:Apply a layer of asphalt or concrete over the base layer to create the pavement surface.Compact the pavement to ensure durability and smoothness.6. Drainage System Installation:Install drainage structures, such as culverts or ditches, to manage surface water runoff.Ensure proper grading and slope to facilitate efficient drainage.7. Signage and Markings:Install road signs, traffic signals, and pavement markings to guide and control traffic flow.Ensure compliance with safety standards and regulations.8. Safety Measures:Implement safety features like guardrails, crash barriers, and lighting systems to enhance road safety.Conduct thorough inspections to identify and address any potential hazards.9. Final Inspection and Handover:Conduct a comprehensive inspection to ensure the highway meets all design specifications and quality standards.Hand over the completed road to the relevant authorities or agencies for maintenance and operation.中文回答:三级公路的施工流程包括以下几个关键步骤,以确保项目的成功完成。
目录1、路基施工工艺流程图2、路基开挖施工工艺流程图3、路基填筑施工工艺流程图4、圆管涵施工工艺流程图5、盖板涵施工工艺流程图6、涵洞施工工艺流程图7、防护工程(干砌片石)施工工艺流程图8、挡土墙施工工艺流程图9、浆砌边沟工程施工工艺流程图10、桥梁钻孔桩施工工艺流程图11、U型砼桥台施工工艺流程图12、桥墩施工工艺流程图13、后张法预应力梁施工工艺流程图14、桥梁安装施工工艺流程图15、空心板梁施工工艺流程图16、现浇机耕天桥上部结构施工工艺流程图17、级配碎石施工工艺流程图18、二灰砂砾(级配砂砾)底基层施工工艺流程图19、水泥稳定碎石基层施工工艺流程图20、二灰砂砾(水泥稳定砂砾)基层施工工艺流程图21、水泥砼路面施工工艺流程图22、沥青砼面层施工工艺流程图23、沥青混合料厂拌施工工艺流程图24、交通安全设施施工工艺框图25、施工质量检测工艺流程图26、安全保证体系框图路基施工工艺流程图路基开挖施工工艺流程图涵洞施工工艺流程图防护工程(干砌片石)施工工艺流程图浆砌边沟工程施工工艺流程图U型砼桥台施工工艺流程图桥墩施工工艺流程图桥梁钻孔桩施工工艺流程图空心板梁施工工艺流程图桥梁安装施工工艺流程图砂砾调平层工艺流程图水泥稳定碎石基层施工工艺流程图施工工艺流程图水泥砼路面施工工艺流程图盖板涵施工工艺流程图后张法预应力梁施工工艺流程图现浇机耕天桥上部结构施工工艺流程图砂砾石垫层施工工艺流程图沥青混合料厂拌工艺流程图沥青砼面层施工工艺流程图交通安全设施施工工艺框图施工质量检测工艺流程图安全保证体系框图。
京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计13.4 重点分项工程施工工艺流程图施工准备平整场地施工方案审批测量放线定位监理工程师检查埋设钢护筒钻机就位对中桩位复测泥浆制备钻孔、排渣钢筋原材料试验灌注桩成孔成孔检测钢筋骨架制作下钢筋笼导管制作、试压下导管孔底检测清孔制作混凝土试块灌注混凝土监理批准配合比试块试压合格清理桩头无损探伤试验下一工序施工图 7.2.1.1-1 冲击钻孔桩施工工艺流程图开孔钻进直至基岩顶面原材料检验制备混凝土京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计测量定位钻机就位下护筒钢筋笼制作钻孔弃土外运成品检测成孔检查、清孔钢筋笼存放下钢筋笼钢筋笼运输下导管浇筑试块制作清洗导管养护强度试验图 7.2.1.2-1旋挖钻孔桩施工工艺流程图检测有害气体浓度场地平整桩位测定通风换气开挖桩孔孔口设置吊架爆破、孔内出土立模灌注护壁下一循环成孔检查砼配合比选配钢筋笼吊装就位钢筋笼加工制作砼拌合与运输灌注桩身混凝土图 7.2.1.3-1人工挖孔桩施工工艺流程图桥梁扩大基础施工工艺框图基坑开挖测基底承载能力测量放样钢筋下料钢筋绑扎支模板砼拌合运输浇注砼试块制作养生试块检测拆模基础回填图 7.2.2-1基础和台身施工工艺流程图施工准备底模清理、上脱模剂梁板钢筋制作及安装预应力孔道安装材料进场配合比模板安装模板制作或整修搅拌砼砼浇筑及抽拔棒施工试块制作拆模、养生预应力筋张拉孔道注浆试块制作封锚移梁至存梁区图 7.2.3.1-1预应力T梁施工工艺流程图台座预制绑扎钢筋骨架支模安装波纹管砼浇筑制作砼试压块养护、拆模穿钢绞线检验、标定张拉机具张拉预应力钢束压砼试块灌浆机具准备孔道压浆制作水泥浆试压块封锚压水泥浆试块移梁至存梁区图 7.2.3.3-1预应力箱梁施工工艺流程图支架设计地基处理安装支架支架预压模板设计安装底模安装支座垫板及支座绑扎底板、腹板钢筋、布设波纹管安装内膜绑扎顶板钢筋,布设波纹管安装侧膜预埋件及预留孔洞模板、钢筋、预埋件及支架稳定检逐孔浇注梁体砼(预留查验收墩顶工作缝)养生拆除内膜及侧模清理孔道穿束机穿设钢绞线压试件达到90%设计强度张拉跨内短束张拉墩顶负弯矩处钢绞线浇注联中工作缝张拉整联通长钢绞线、压浆、封端浇注联端工作缝落支架拆除底模及支架洞顶截水沟开挖、砌筑洞口其他排水工程路基或桥梁施工洞口土石方开挖边仰坡及成洞面临时防护套拱、管棚辅助进洞措施施工明洞基础及洞口段路基硬化地基承载力检测二衬台车进场洞身施工洞身检测明洞回填防水层施工片石回填洞门施工图 7.3.1.1-1洞口与明洞工程的施工工艺流程图小导管加工制作材料准备浆液配制注浆量控制京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计地质调查,注浆设计现场注浆试验制定施工方案测量布孔凿岩机钻孔清孔,成孔检查安装导管,封堵管口注浆压力控制喷砼封闭掌子面连注浆管路,试运转注浆泵就位注浆作业转入断面开挖效果检查,方案调整图7.3.1.3-2超前小导管注浆施工工艺流程图锚杆制作、超前小钢管施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计测绘出开挖轮廓线、标出孔位靠掌子面正确安装固定钢架凿岩机就位、定位开孔钻孔至预定孔深,并随时调整方向清孔、成孔检查浸泡、填塞锚固剂小钢管浸泡、填塞锚固剂制作顶入安装锚杆将锚杆(小钢管)尾部和钢架焊连质量检查合格,进入下道工序图 7.3.1.3-4-4超前锚杆施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计测量放样钢拱架加工质量验收清除底脚浮渣钢拱架组拼安装钢拱架和系统锚杆焊连定位加设鞍形垫块打锁脚锚杆焊纵向连接筋隐蔽工程检查验收图 7.3.1.3-5钢架安装工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计湿喷砼施工工艺流程图配备设备及劳力组织方法砼制备运输方案、喷射方法方案报批喷砼试验配合比报批材料试验报告材料、机具、劳力准备风、水、电准备施工准备断面检查清洗岩面强制式拌和机拌和混凝土制备分次投料拌和混凝土运输砼运输车运输湿喷机先墙后拱、分层、分区进行初喷S形运动、螺旋状喷射首层着重填平、补齐复喷强度检验:压试件质量检查方案审批结束图 7.3.1.3-6湿喷混凝土施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计施工段断面净空检查防水板检查防水板铺设台车就位防水板焊成大幅喷砼面检查处理返修否是安装纵、环向盲管焊缝检查铺设防水卷材与既有衬砌段防水板焊接连接重焊或修补否接头焊接检查防水板检查签证图 7.3.1.4-1防水板铺挂施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计监控量测确定二次衬砌施作时机轨道高程测量布设轨道控制轨距台车就位顶模升起侧模张开净空检测模板调整到位输挡台基止面涂预送头水埋车仓板脱管板条件加清整模安安安安固理修剂装装装装矮边墙底板施工施工配合比混凝土拌合塌落度检查混凝土浇筑混凝土入泵混凝土运输不合格返工拆模养护图 7.3.1.5-1二次衬砌施工工艺流程图监控京新量高速测胶泥施湾至工西洋工河(冀艺晋界流)公程路图SG1 合同段实施性施工组织设计分析地质勘测资料制定监控量测计划施工监控地表地质预测围岩支护围岩支护与开挖验结构状态结构受力观测证观测变形量测否否修改支护参综合分析判断修改支护参数数是施工是否完成是结束图7.3.1.15-1隧道监控量测施工工艺流程图施工准备准备阶段基底处理填筑区段分层填筑摊铺整平平整区段施工阶段洒水或晾晒碾压区段碾压夯实检测区段检验签证整修验交阶段路基整修图 7.4.1.7-1路基土方填筑施工工艺流程图施工放样清表路基基底碾压上料、推土机推平重型压路机分层碾压人工用细石块、石屑找平不平处试验检测填报质量检验报告单进行下道工序图 7.4.1.8-1填石路基施工工艺流程图施工准备原地面测量放样平整场地开挖减振、排(降)水沟(井)试区检测垫层铺设场地平整测量各夯区设置孔隙水观测计等检测第一遍夯点布置测量场地高程机械就位测夯锤落距测每次夯沉量,完成一个夯点夯击完成第一遍各点夯击测场地标高机械整平场地第二遍夯击控制夯击数、夯锤落距和夯印搭接满夯平整场地土工、荷载试验测量地面标高资料整理隐蔽验收下一夯区或工序图 7.4.1.9-1强夯施工工艺流程图施工准备挖基基地处理片石、砂浆砌筑勾缝养生边坡处理液压喷播喷料准备覆盖无纺布练苗揭布播后管理图 7.4.1.16-1路堤、路堑衬砌拱植草防护施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计配料拌合、检测及运输入模振捣脱模码垛养生运输安装检查验收合格格内回填土、植草返工不合格图 7.4.1.16-2矩形、空心六棱预制块防护施工工艺流程图施工准备及放样基坑开挖基底处理基底标高及地基承载力经监理工程师检验合格片石墙身砌筑砂浆拌制墙背回填锥坡图 7.4.1.16-3路堤挡土墙施工工艺流程图边坡测量施工准备电力设备布设边坡安全检测搭设脚手架边坡修整钻孔设备布设锚杆钻孔锚杆孔位放样清孔、验孔支架焊接插入锚杆锚杆孔灌注水泥砂浆砼试块制作达到设计强度锚杆拉拔试验测量放线开挖框架梁基础钢筋制作安装模型安装、加固伸缩缝设置砼试块制作浇注混凝土养生浆砌片石封顶框格内喷播植草拆除脚手架图 7.4.1.16-4锚杆框架梁植草护坡施工工艺流程图施工准备测量放样基础开挖地基承载力检测基底处理基础施工整管节拼接连接涂刷沥青涵背回填材料检验洞口铺砌及防护成品检测、验收图 7.4.2.1-1管涵施工工艺流程图不满足设计要求京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计测量放样基坑开挖、排水基坑检验监理签证基地处理满足设计要求基础砼浇筑养护涵台砼浇筑养护立拱支架、安装模板检查、验收、签证对称浇筑拱圈砼养护拱圈砼强度达到75%施做沉降缝防水检查、验收、签证护拱浆砌片石涵侧、涵顶土对称回填出入口、八字墙等附属工程竣工验收图 7.4.2.1-2拱涵施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计测量定位平整场地基坑开挖合格不合格基坑验收制作模板基础模板不合格验收合格制作相同条件砼试块浇筑砼拆模及养护不合格基础验收合格制作模板、钢筋绑扎台身模板及钢筋不合格验收合格制作相同条件砼试块浇筑砼拆模及养护不合格台身验收合格制作模板、钢筋绑扎盖板(帽石)模板及钢筋不合格验收合格制作相同条件砼试块浇筑砼拆模及养护不合格盖板(帽石)验收合格洞口施工洞底铺砌及防水合格台背回填清理现场分项工程验收图 7.4.2.1-3板涵施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计明确施工方案工程师审批下承层交验合格并经工程师验收整理下承层测量定样放样打出路肩线培路肩土放标高基准线,两侧设置钢钎挂钢绞线控制标高摊铺机就位卸料摊铺机上摊铺碾压:振动压路机稳压;振动压路机振压、胶轮柔性碾压、三轮压路机静压质量自检原材料进场并报验完成组成设计并报工程师审批根据组成设计调试拌合楼直至满足生产要求,报工程师认可装载机装料于各料斗调整调速电机控制配合比拌缸充分拌和混合料卸于自卸车运输小修处理报验进行下道工序京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计下层通过监理验收材料检验报监理审批清扫下层材料准备,沥青加温放边缘线沥青洒布车运输沥青按设计数量喷洒处理接头质量自检报监理验收交通管制进行下道工序图7.5.3.3-1透层、粘层施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计下承层(或透层)已被监理工程师验收清扫路面基层(或透层)测量定线放样放标高控制基准线,两侧打钢钎挂钢绞线控制摊铺机就位卸料于摊铺机上铺装碾压:先用双钢轮压路机稳压一遍,然后用胶轮、双钢轮振动压路机复压、最后用双钢轮压路机终压质量自检并报监理验收交通管制原材料及组成设计经监理工程师认可沥青加温装载机装各种矿料入拌和设备,沥青泵入拌和设备按照配合比拌和各种材料施工单位对混合料自检,监理工程师抽检不合格成品装入自卸车运输废料完成生产配合比设计,铺筑试验段对生产配合比验证,报工程师认可进行下道工序图 7.5.3.3-2沥青混凝土面层施工工艺流程图原材料验收入库标志板按照图纸制作标志架按照图纸制作京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计验收浇安入经驻按筑库装地监图混标理工挖凝监志监程师标土理架理验收志及验体验合格架基表收及收方可基础标验面质进入础预志热工地坑埋收检板镀入验件锌库收处理图 7.7.1.1-1交通标志施工工艺流程图施工准备封闭交通清扫路面放样加热涂料划线机预热校核标线喷涂维护,待标线干硬后开放交通图 7.7.1.2-1交通标线施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计开挖基坑石方地段或构造物地段土方段自检及监理验证不打入立桩合埋入立桩、浇筑砼格返工自检及监理验证合格安装护栏板不合线型调整格返工自检及监理验证图 7.7.1.3-1波形梁钢护栏施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计放线订购立柱、网片基坑开挖不合报请监理认可格返工自检、监理检验浇筑砼基础自检、监理检验安装立柱调整立柱线形安装编织网片不合调整格返工自检、监理检验图 7.7.1.4-1隔离栅施工工艺流程图京新高速胶泥湾至西洋河(冀晋界)公路SG1 合同段实施性施工组织设计13.5 组织机构图23813.6 工期保证体系图项目经理工程管理部安全环保部物质装备部计划合同部工地试验室技术质量部财务部编提实保制保及抓制保协供施及证保定合证时好实证调施监时施证落理试进现施机各工督检工材实调验行场性械工技避查行料进配资现施组完序术免签车供度资料场工织好衔保返证安应计金及试管设率接证工全划时验理计实现工期目标13.7 质量保证体系图质量保证体系项目经理部综计工安技工物合划程全术地资财事合管环质试装务务同理保量验备部部部部部部室部思想教育技术保障措施物资供应保障施工保证机械保证经济责任制为试签质监制全质岗材材技实严验机机制完业订量督定面量前料料术行密检械械定善主经第检质质管培购检交三组测使保奖考服济一查量量理训进验底检织手用养惩核务责思制目管教制制制制制作段制制条手思任想度标理育度度度度度业完度度例段想状善下自工道质地检工量制成先提试和序监定立培高验监是督创Q训全室理让机优C后员和检业构规小上素检查主检划组岗质测制满查保度意障明确检合责作任验理业落检安程实测排序到及使集个时用标人准QC小组课题研究取得上岗证施工作业促进施工生产改进措施信息反馈质量评定奖优罚劣考核兑现项目经理项目总工程师安全生产委员会安全管理部技术质量部工程管理部计划合同部物资装备部财务部外协管理部综合事务部各分部项目经理各分部安全部门各分部安全员、技术员管理和领导关系支持协作和保障关系环境保护领导组组长:项目经理 副组长:技术负责人各业务部门负责人 作业队长 专、兼职检查员环保目标保证 技术保证 施工过程保证 经济保证 检查、监控与 建制 实 完 制 施主建 定环 制 立 宣定施善工物管 环立环定期现 保 定 传 员 环环环方资部 保环不 境保 保 保 岗法 设 费 保 场 措 管目 教工位 门 定 监 施 理育培实技技责工备用奖期 目 标计 训施 术 术 艺 保 统 到 惩 控改 检 责方 政 措 任保 证合 位制进标任 划制查案策施证治度制理防建城 防止 防 筑城 市 噪 止 生 文 市 止声 大 活 物 绿 道 水 、 气 垃 保 化 路 污 光污圾护保保 染污染处护护染理环境保护达标。
For personal use only in study and research; not for commercial use路基工程施工工艺及流程图(史上最全)1前期准备工作<1>路基开工前,首先要进行测量定线工作,其内容包括导线、中线、水准点复测、断面检查与补测。
测量精度以交通部颁布的《公路路线勘测规程》的要求为标准。
测量的工具,使用精度符合要求的全站仪,红外线测距仪,经纬仪和水准仪。
当导线点与水准点不能满足施工要求时,报监理工程师批准,对其进行加密,成果资料提交监理工程师审查后签字认可后使用。
在开工前进行施工放样,放出路基边缘、坡口、坡脚、边沟护坡道、借土场等具体位置,标明其轮廓,报监理工程师检查批准。
对工程沿线及借土场应取有代表性的土样,按JTJ051-93标准试验方法,进行天然液限、塑性指数、密度、含水量等的试验。
用于填方的土样,测量最大干容性、最佳含水量或毛体积比重和土的加州承载比GBR值,测试结果报监理工程师审批。
<2>清理掘除。
在路线用地范围内的树木、杂草、灌木等应予清除,按照监理工程师指定的深度和范围清除并运至工程师指定地点,路基用地范围内的结构物按要求清除,对于路基附近的危险建筑予以适当加固,对文物古迹妥善保护。
路基表面清理完工后,并根据规范的要求进行填前碾压并达到监理工程师的规定要求。
挖方或填方区域内,所有的腐植土、淤泥、表层植土均应挖出干净,按环保规定弃置路基范围用地以外,并按《公路路基施工技术规范》弃土条例要求处理,对因挖出孔穴、障碍物而留下的孔洞、树根按要求进行处理。
2路基的填筑方法路基宜采用水平分层填筑,即按照横断面全宽分成水平层次,逐层向上填筑。
如果原地面不够平坦,填筑应从最低处分层填起,每填一层经过压实达到符合规定要求后,再添一层。
对于原路面纵坡大于12%的地段。
可采用纵向分层填筑法施工,沿纵坡逐层、分层填压达到密实。
但填之路堤的上部,仍采用水平分层填筑法。
公路工程
施工工艺流程图
导线水准点交接工作流程图
(a) 监理工程师交桩(b) 设计单位直接交桩
混合料配合比施工工艺流程图
沥青砼面层(底、中、表)施工工艺流程图
路基工程施工工艺流程图
路基路面施工工艺流程图
路基填料施工工艺流程图
路基整修施工工艺流程图
路面垫层、底基层、基层施工工艺流程图
路线放样工作流程图
排水及小型构造物施工工艺流程图
软弱地基强夯片石墩加固施工工艺流程图
石灰稳定土施工工艺流程图
水泥混凝土面层施工工艺流程图
松填土地基强夯加固施工工艺流程图
填方路基施工工艺流程图
填土压实施工工艺流程图
挖方路基工程施工工艺流程图
预制件施工工艺流程图
原地面清理及填前压实施工工艺流程图(注:文档可能无法思考全面,请浏览后下载,供参考。
可复制、编制,期待你的
好评与关注)。