污水处理厂设计说明书
- 格式:doc
- 大小:41.00 KB
- 文档页数:3
污水厂设计说明书一、污水厂的设计规模设计规模:污水厂的处理水量按最高日最高时流量,污水厂的日处理量为:该厂按远期2010年一期2.6万吨/天建设完成,污水厂主要处理构筑物拟分为二组,每组处理规模为1.3万吨/天。
这样既可满足近期处理水量要求,有留有空地以三期扩建之用。
远期2.6万吨,一期建设,计算主要按远期计算,由于没有工业废水的变化系数,所以按生活污水量来取其时变化系数。
二、进出水水质该水经处理以后,水质应符合国家《污水综合排放标准》(GB8978-1996) 中的一级标准,由于进水不但含有BOD 5,还含有大量的N ,P 所以不仅要求去BOD 5 除还应去除不中的N ,P 达到排放标准。
单位:mg/L CODcr BOD 5 SS NH 3-N TP 进 水 380 190 238 49 4.9 出 水602020150.5三、处理程度的计算1.溶解性BOD 5的去除率活泩污泥处理系统处理水中的BOD 5值是由残存的溶解性BOD 5和非溶解性BOD 5二者组成,而后者主要是以生物污泥的残屑为主体。
活性污泥的净化功能,是去除溶解性BOD 5。
因此从活性污泥的净化功能来考虑,应将非溶解性的BOD 5从处理水的总BOD 5值中减去。
处理水中非溶解性BOD5值可用下列公式求得:(此公式仅适用于氧化沟) L mg e e C BOD e f /6.13)1(42.1207.0)1(42.17.0523.0523.05=-⨯⨯⨯=-⨯=⨯-⨯-∴ 处理水中溶解性BOD 5为20-13.6=6.4mg/L ∴ 溶解性BOD 5的去除率为:%63.96%1001904.6190=⨯-=η 2 .COD cr 的去除率%21.84%10038060380=⨯-=η 3.SS 的去除率%60.91%10023820238=⨯-=η 4.总氮的去除率出水标准中的总氮为15mg/L ,处理水中的总氮设计值取15mg/L ,总氮的去除率为:%39.69%100491549=⨯-=η 5.磷酸盐的去除率进水中磷酸盐的浓度为4.9mg/L 计。
污水设计说明范文污水设计是为了处理一种被废弃的水类,其中含有人类生活和工业中产生的各种污染物质,通常被称为污水。
污水设计的目标是将污水清除净化,以达到可以安全地排放或再利用的标准。
以下是污水设计的说明。
1.设计目标和要求:-控制水的流量:根据预测的污水产生量和规模,确定处理设备的尺寸和容量。
-移除悬浮物:通过沉淀池、过滤器或其他方法,将悬浮物从污水中移除。
-分解有机物:利用生物降解过程,将有机物质分解为更简单的成分。
-消除有毒物质:通过化学处理或其他方法,将有毒物质从污水中去除,以保护环境和人类健康。
-达到排放标准:设计的处理系统应该能够将污水处理成符合国家或地方的排放标准。
-提供可再利用的水源:如果可能,设计的处理系统应该能够将处理后的水用于灌溉、冲洗等非饮用水用途。
2.工艺选择:-传统生物处理工艺:包括活性污泥法、厌氧法等,适用于大部分的污水处理工程,效果稳定可靠。
-高级氧化工艺:如紫外光氧化、臭氧氧化,适用于处理高浓度有机物质或有毒物质的污水。
-流化床生物反应器工艺:具有高浓度的微生物生物膜、高处理效率、操作灵活等优点。
3.处理设备:-预处理设备:包括格栅、沉砂池、细菌过滤器等,用于去除污水中的大颗粒物、沉淀物和悬浮物。
-生物处理设备:主要包括活性污泥池、曝气池、沉淀池等,通过微生物的作用将有机物质降解成更稳定的无机物质。
-高级处理设备:如紫外线消毒器、臭氧发生器等,用于消除污水中的有害物质和微生物。
-污泥处理设备:污泥干化、污泥沼气等,用于对处理过程中剩余的污泥进行处理和利用。
4.设计流程:-收集和分析数据:包括污水产生量、水质情况、处理前后的水质要求等。
-工艺选择和设备配置:根据数据分析结果,选择适合的工艺和设备,并进行配置。
-设计参数计算:根据具体的处理要求和设备特性,计算出各项设计参数,例如流量、悬浮物去除率、氧化效率等。
-设计草图和施工图:根据计算结果,绘制出设计草图和施工图,并指导实际的建设工程。
贵州大学课程设计任务书课题名称污水处理工程学院土木工程学院专业给水排水工程班级 101学号 1008070030姓名程威污水处理工程课程设计任务书一、目的与任务1.目的本设计是污水处理工程教学中一个重要的实践环节,要求综合运用所学的有关知识,在设计中掌握解决实际工程问题的能力,并进一步巩固和提高理论知识。
2.任务根据已知资料,进行城市污水处理厂的工艺设计。
要求确定污水处理流程,计算各处理构筑物的尺寸,布置污水处理厂总平面图和高程图。
二、设计内容和要求1.设计说明书说明城市概况、设计任务、工程规模、水质水量、工艺流程、设计参数、主要构筑物的尺寸和个数、主要设备的型号和数量等;有关内容可参考如下所列。
第一章总论第一节设计任务和内容第二节基本资料第二章污水处理工艺流程说明污水处理工艺流程比较、论证(提出2种以上的工艺方案进行比较),污水处理工艺流程选定。
第三章污水处理构筑物设计按照选定的工艺流程,分节设计每个污水处理单元,简要论证比较,列出各构筑物的计算过程、主要设备(如水泵、鼓风机等)的选取。
第四章污泥处理构筑物的设计。
按照选定的污泥处理工艺流程,分节设计每个污泥处理单元,说明每个处理单元内的主要设备配置情况。
第五章污水厂总体布置第一节主要构(建)筑物与附属建筑物第二节污水厂平面布置第三节污水厂高程布置污水处理厂的高程计算(各构筑物内部的水头损失查阅教材或手册,构筑物之间的水头损失按管道长度计算)2设计图纸污水处理厂总平面布置图和高程布置图各一张,均为A2图幅的CAD 制图。
污水厂总平面图应按初步设计要求去完成,图上应绘出主要处理构筑物、处理建筑物、辅助构(建)筑物、附属建筑物、道路、绿化地带及厂区界限等,并用坐标表示其外形尺寸和相互距离,应有坐标轴线或坐标网格。
总平面图上绘出各种连接管渠,管道以单线条表示,并标明管径。
图中应附构(建)筑物一览表,说明各构(建)筑物的名称、数量及主要外形尺寸。
图中应附图例及必要的文字说明。
污水处理厂计算说明书(毕业设计)摘要本设计是关于A市污水处理厂的设计。
根据毕业设计的原始资料及设计要求对出水水质的要求:即要求脱氮除磷,出水达到一级排放标准,确定A2/O和三沟式氧化沟两大污水处理工艺进行工艺设计和经济技术比较。
一级处理中,进厂原水首先进入中格栅,用以去除大块污染物,以免其对后续处理单元或工艺管线造成损害。
本设计设置中格栅,中格栅后有污水提升泵提升污水进入细格栅。
然后进入平流式沉砂池,用以去除密度较大的无机砂粒,提高污泥有机组分的含率。
以上的污水处理为物理处理阶段,对A2/O和三沟式氧化沟两大工艺是相同的。
下面分别对这两大工艺的生物处理部分进行简要介绍。
三沟式氧化沟设计为厌氧池与氧化沟分建。
氧化沟三沟交替进水,且兼具二沉池的作用。
厌氧池释放磷。
随着曝气器距离的增加,氧化沟内溶解氧浓度不断降低,呈现缺氧区好氧区的交替变化,即相继出现硝化和反硝化的过程,达到脱氮的效果。
同时好氧区吸收磷,达到除磷的效果。
A2/O工艺的生物处理部分由厌氧池、缺氧池和好氧池组成。
厌氧池主要功能是释放磷,同时部分有机物进行氨化。
缺氧池的主要功能是脱氮。
好氧池是多功能的,能够去除BOD、硝化和吸收磷。
通过投资概算,运行费用的计算,经济比较及技术比较等最终确定氧化沟工艺为最佳方案。
剩余污泥则经污泥提升泵提升至重力浓缩池。
以降低污泥的含水率,减小污泥体积。
泥经浓缩后,含水率尚还大,体积仍很大。
为了综合利用和最终处置,需对污泥进行干化和脱水处理。
在完成污水和污泥处理构筑物的设计计算后,根据平面布置的原则,综合考虑各方面因素进行了污水厂的平面布置。
据污水的流量对连接各构筑物的管渠进行了选径、确定流速以及水力坡降,然后进行了水力损失计算。
据水力损失计算对污水和污泥高程进行了计算和布置。
在最后阶段完成了对平面图、高程图及各种主要的构筑物的绘制。
为了使工作人员能在清新美丽的环境中工作,我们布置了占总厂面积30%的绿化,还设有喷泉花坛和人工湖。
2设计说明书2.1去除率计算 2.1.1 BOD 5的去除率原污水BOD 5值(S 0)为200mg/L ,出水BOD 5为20mg/L ,则BOD 5的去除率为:η=%89%10019020190=⨯- 2.1.2 COD Cr 的去除率原污水COD Cr 为480mg/L ,出水COD Cr 为100 mg/L ,则COD Cr 的去除率为:%79%100084010480=⨯-=η 2.1.3 SS 的去除率原污水SS 为280mg/L ,出水SS 为20mg/L ,则SS 的去除率为:%39%10028020280=⨯-=η 2.1.4 氨氮的去除率原污水水NH 3-N 为35 mg/L ,出水NH 3-N 为8mg/L ,则NH 3-N 的去除率为:%77%10035835=⨯-=η 2.2城市污水处理工艺选择小区污水处理的目的是使之达标排放或污水回用于小区绿地灌溉、道路、冲洗汽车,以保护环境不受污染,节约水资源。
污水处理工艺流程的选择应遵循以下原则:1.一般来说,不同小区对出水的要求差异较大。
应根据我国《地面环境质量标准》(GB3838—88)和《污水综合排放标准》(GB8978—96)的有关规定和当地环保部门的要求确定处理程度,以确保出水水质。
如果出水采用土地处理法处理,则按土地处理法的要求计算;2.污水处理设施的设计和建设必须结合小区的整体规划和建筑特点,即外观设计上要与小区建筑环境相协调,以求美观;3.在污水处理工艺上力求简单实用,以方便管理;4.在高程布置上应尽量采用立体布局,充分利用地下空间。
平面布置上要紧凑,以节省用地;5.污水处理厂位置应尽可能位于小区下风向,与其它建筑物有一定的距离,以减少对环境的影响;6.设备化,定型化,模块化,施工安装方便,运行简易,设备性能稳定, 适合分期建设;7.处理程度高,污泥产量少,并尽可能采用节能处理技术;8.处理构筑物对水力负荷和有机物负荷的适应范围较大,使系统有较好的经受冲击负荷的能力。
目录第一章城市概况及设计任务 (3)第二章水厂规模的确定及水质分析 (3)第一节水厂规模的确定 (4)第二节处理水质分析 (5)第三章污水处理厂工艺流程的确定 (5)第一节污水及污泥处理工艺的选择 (5)第二节工艺流程的确定 (7)第四章污水厂处理构筑物工艺设计计算.???????? 8第一节泵前中格栅设计计算 (8)第二节污水提升泵房设计计算 (10)第三节泵后提升泵房设计计算 (12)第四节平流式沉砂池设计计算...............................................14第五节辐流式初沉池设计计算(中心进水周边出水) (17)第六节传统活性污泥鼓风曝气池设计计算 (21)第七节向心辐流式二沉池设计计算(周边进水中心出水) (26)第八节接触消毒池与加氯间设计计算 (28)第九节巴式计量槽设计计算 (30)第五章污泥处理构筑物工艺设计计算 (32)第一节污泥量计算 (32)第二节污泥泵房设计计算 (33)第三节污泥重力浓缩池设计计算 (34)第四节贮泥池设计计算 (36)第五节污泥厌氧消化池设计计算 (37)第六节机械脱水间设计计算 (40)第六章污水处理厂平面布置 (42)第七章污水处理厂高程布置 (43)第一节各污水处理构筑物及连接管渠的水头损失计算 (43)第二节污水高程系统计算 (45)第三节污泥高程系统计算 (46)参考资料 (50)附:1污水处理厂总平面布置图2 污水处理厂高程布置图第一章城市概况及设计任务第一节城市概况东营市地处中纬度,背陆面海,受亚欧大陆和西太平洋共同影响,属暖温带大陆性季风气候,气候温和,四季分明。
春季回暖快,降水少,风速大,气候干燥,有"十春九旱"的特点;夏季气温高,湿度大,降水集中,有时受受台风侵袭;秋季气温急降,雨量骤减,秋高气爽;冬季雨雪稀少,寒冷干燥。
主要气象灾害有霜冻、干热风、大风、冰雹、干旱、涝灾、风暴潮灾等。
污水处理厂设计说明书目录第一章污水处理工程设计计算说明书1.1设计任务1.2设计内容1.3基本资料1.4设计水质水量计算第二章污水的一级处理2.1格栅设计计算2.2沉砂池设计计算2.3初次沉淀池设计计算第三章AA/O生物脱氮除磷工艺计算3.1设计参数3.2平面尺寸计算3.3进出水系统3.4其他管道设计3.5剩余污泥量第四章生物处理后处理4.1二次沉淀池设计计算4.2消毒设施计算4.3计量设备设计计算第五章污泥处理构筑物计算5.1污泥量计算5.2污泥浓缩池设计计算5.3贮泥池设计计算5.4污泥消化池设计计算5.5污泥脱水第六章污水处理厂布置6.1污水处理厂平面布置6.2污水处理厂高程布置第一章设计计算说明书1.1设计任务某城镇污水处理厂1.2设计内容1 •根据给定的原始资料,确定污水厂的规模和污水设计水量。
2 .按照原始资料数据进行处理方案的确定,拟定处理工艺流程,选择污水、污泥的处理构筑物,并用方框图表示。
进行工艺流程中各处理单元的处理原理说明。
3. 进行各构筑物的尺寸计算,各构筑物的设计参数应根据同类型污水的实际运行参数或参考有关手册选用。
4. 设备选型计算。
5. 平面和高程布置。
根据构筑物的尺寸,合理进行平面布置;高程布置应在完成各构筑物计算及平面布置草图后进行。
各处理构筑物应尽力采用重力流,各处理构筑物的水头损失可直接查相关资料,但各构筑物之间的连接管的水头损失则需计算确定。
6. 编写设计说明书、计算书。
1.3基本资料1、设计流量:Q 平=30000+ 28 X1000 m 3/d (No 学号,1 〜33 号)总变化系数:K Z= 1.42、污水水质:C0D=200-300mg/LBOD5=100-150 mg/LSS=200mg/LNH3-N=35 mg/LpH=6 〜93、受纳水体:位于城市的东侧自南向北,20年一遇洪水水位标高322.5m ,常水位标高320.3m。
4、选址:根据城市总体规划,污水厂拟建于该城市下游河流岸边,地势平坦,拟建处的地面标高326.30m。
目录一、设计内容 (1)二、污水厂的设计规模 (2)三、进出水水质 (2)四、处理程度的计算 (2)五、城市污水处理设计 (4)1、工艺流程的比较 (4)2、工艺流程的选择 (9)六、污水处理构筑物设计 (10)1.粗格栅和提升泵房(两者合建) (10)设计计算 (11)2、细格栅和沉砂池 (13)七、污泥处理构筑物的设计计算 (25)1、污泥泵房 (25)2、污泥浓缩池 (25)八、污水厂平面,高程布置 (29)1、平面布置 (29)2、管线布置 (29)3、高程布置 (30)一、设计内容1、城市概况该市地处东南沿海,北回归线横贯市区中部,该市在经济发展的同时,城市基础设施的建设未能与经济协同发展,城市污水处理率仅为3.4%,大量的污水未经处理直接排入河流,使该城市的生态环境受到严重的破坏。
为了把该城市建设成为经济繁荣、环境优美的现代化城市,筹建该市的污水处理厂已迫在眉睫。
2、自然条件:(1)地形、地貌:该市具有中低山、丘陵、盆地和平原等多种地貌类型,地势西北高,东南低。
(2)工程地质:该市地质岩层出露白垩系地层,市区地层覆盖层为第四纪近代冲击层,厚40~60米,上层一般为耕植土、淤土、砂质粘土、亚粘土、细中砂和残积粘土。
地基承载力为1.2~3.5kg/cm2,地震等级为6级以下,电力供应良好。
(3)气象资料:该市地处亚热带,面临东海,海洋性气候特征明显,冬季暖和有阵寒,夏季高温无酷暑,历年最高温度38℃,最低温度4℃,年平均温度24℃。
常年主导风向为南风。
(4)水文资料:该市内河流最高洪水位+2.5米,最低水位-0.5米,平均水位为+0.5米,地下水位为离地面2.0米,厂区内设计地面标高为+5.0米。
二、污水厂的设计规模设计规模:污水厂的处理水量按最高日最高时流量,污水厂的日处理量为2.5万吨/天,污水厂主要处理构筑物拟分为二组,每组处理规模为1.25万吨/天。
三、进出水水质该水经处理以后,水质应符合国家《污水综合排放标准》(GB18918-2002)中的一级B标准.四、处理程度的计算1.溶解性BOD5的去除率活泩污泥处理系统处理水中的BOD5值是由残存的溶解性BOD5和非溶解性BOD5二者组成,而后者主要是以生物污泥的残屑为主体。
某城镇污水处理厂工艺初步设计设计说明书设计说明书一、项目背景城镇污水处理厂位于市区,为了解决城镇污水处理问题,提高环境质量,本项目拟建设一座污水处理厂,采用先进的工艺和设备,对城镇污水进行处理,达到国家相关排放标准。
本设计说明书旨在对污水处理厂的工艺流程进行初步设计,并附带相关计算书。
二、设计目标1.处理能力:本污水处理厂的设计处理能力为每小时处理1000m³的污水量,满足城镇的日常需求。
2.出水水质:处理后的污水经过处理达到国家相关排放标准,出水水质符合要求。
3.运行稳定可靠:通过合理的工艺选择和设备配置,确保污水处理厂的运行稳定可靠,减少故障发生率和维修成本。
4.经济、环保、节能:在满足处理需求的前提下,优化设计,提高设备利用率,降低能耗和运营成本,同样也要确保环保要求的实现。
三、工艺流程1.进水预处理:将进水进行初步处理,包括格栅、砂沉池和调节池等,去除大颗粒悬浮物和沉淀杂物。
2.活性污泥法处理:采用活性污泥法进行二级处理,包括好氧池和二沉池。
好氧池中的活性污泥与污水进行接触和氧化降解,二沉池进行污泥沉淀和污水澄清。
3.三级处理:在二沉池出水后引入生物膜反应器,通过生物膜的附着作用,进一步降解有机物和氨氮等。
4.除磷处理:在生物膜反应器之后引入除磷池,加入除磷剂,去除污水中的磷。
5.消毒处理:在除磷池之后进行消毒处理,使用适当的消毒剂对处理后的水进行消毒,确保出水水质达到国家相关排放标准。
6.深度处理:对消毒处理后的水进行深度处理,包括活性炭吸附、超滤和反渗透等,以确保水质符合进一步利用或回收的水质要求。
7.储水和供水:将深度处理后的水进行储存和供水,用于城镇的农田灌溉、景观水景等用途。
四、设计参数1.进水水质:根据城镇的污水水质情况,设计进水水质参数,包括COD、BOD、SS、氨氮等。
2.设计处理能力:设计处理能力为每小时处理1000m³的污水量。
3.设备配置:根据工艺流程,选择合适的设备进行配置,包括格栅机、砂沉池、调节池、好氧池、二沉池、生物膜反应器、除磷池、消毒设备等。
第一部分设计说明书一、城市概况城市概况:江南某城镇位于长江冲击平原,占地约 6.3 km2,呈椭圆形状,最宽处为 2。
4 km ,最长处为 2。
9 km 。
自然特征:该镇地形由南向北略有坡度,平均坡度为 0。
5 ‰,地面平整,海拔高度为黄海绝对标高3。
9~5 。
0 m,地坪平均绝对标高为4。
80 m。
属长江冲击粉质砂土区,承载强度7~11 t/m2,地震裂度6 度,处于地震波及区.全年最高气温40 ℃,最低—10 ℃。
夏季主导风向为东南风。
极限冻土深度为17 cm.全年降雨量为1000 mm,当地暴雨公式为i = (5。
432+4。
383*lgP) / (t+2.583) 0.622,采用的设计暴雨重现期P = 1 年,降雨历时t = t1 + m t2, 其中地面集水时间t1为10 min,延缓系数m = 2。
污水处理厂出水排入距厂150 m的某河中,某河的最高水位约为4。
60 m,最低水位约为1.80 m,常年平均水位约为3.00 m.二、设计任务根据已知资料,确定城市污水处理厂的工艺流程,计算各处理构筑物的尺寸,绘制污水处理厂的总平面布置图和高程布置图,并附详细的设计说明书和计算书.三、设计依据(1)该镇提供的水质水量资料;(2)《中华人民共和国污水综合排放标准》(GB 8978—1996)(3)《城镇污水处理厂污染物排放标准》(GB 18486—2001)(4)《给水排水常用数据手册》(5)《给水排水设计规范》四、设计水质水量及排放标准1。
污水水量(1)生活污水按人均生活污水排放量200L/人;(2)生产废水量按近期8000 m3/d,远期10000 m3/d;(3)工业污水的时变化系数为1.3,污水性质与生活污水类似。
(4)本污水处理厂的设计最大水量为45200 m3/d,日平均水量32000 m3/d.2。
污水进水水质及排放标准序号基本控制项目二级标准(B)mg/L 进水水质mg/L 去除率1 COD 100 400 752 BOD 30 200 853 SS 30 250 884 氨氮25 30 195 T-P 3 4 256 PH 6~9表1 污水进水水质及排放标准四、工艺流程第 2 页共23 页五、厂区平面布置及主要构筑物1、平面布置图江南某城镇污水处理厂是一座小型污水处理厂,全场分为水处理区、污泥处理区、管理区及后勤保障区。
综合实验与设计题目:10000m3/d城市污水处理厂综合设计专业: 环境工程年级: 2011级学号: 3211007605姓名: 廖燧娟指导教师: 谢光炎广东工业大学环境科学与工程学院2015年03月摘要我国水体污染主要来自两方面,一是工业发展超标排放工业废水,二是城市化中由于城市污水排放和集中处理设施严重缺乏,大量生活污水未经处理直接进入水体造成环境污染。
工业废水近年来经过治理虽有所减少,但城市生活污水有增无减,占水质污染的51%以上。
我国水体污染主要来自两方面,一是工业发展超标排放工业废水,二是城市化中由于城市污水排放和集中处理设施严重缺乏,大量生活污水未经处理直接进入水体造成环境污染。
工业废水近年来经过治理虽有所减少,但城市生活污水有增无减,占水质污染的51%以上。
本设计要求处理水量为10000m3/d的城市生活污水,设计方案针对已运行稳定有效的A2/O活性污泥法工艺处理城市生活污水。
A2O工艺由于不同环境条件,不同功能的微)能生物群落的有机配合,加之厌氧、缺氧条件下,部分不可生物降解的有机物(CODNB被开环或断链,使得N、P、有机碳被同时去除,并提高对COD的去除效果。
它可以同NB--时完成有机物的去除,硝化脱氮、磷的过量摄取而被去除等功能,脱氮的前提是NH3N应完全硝化,好氧池能完成这一功能,缺氧池则完成脱氮功能。
厌氧池和好氧池联合完成除磷功能。
关键词:城市生活污水,活性污泥,A2/O目录摘要 ···················································································· II 目录 ······················································································ III 第一章设计概述 ······································································- 1 -1设计任务 ······································································- 1 - 2设计原则 ······································································- 1 - 3设计依据 ······································································- 2 - 第二章工艺流程及说明 ·····························································- 2 -1工艺方案分析 ································································- 2 - 2工艺流程 ······································································- 3 - 3流程各结构介绍 ·····························································- 3 -3.1格栅······························································································· - 3 -3.2沉砂池··························································································· - 4 -3.3初沉池··························································································· - 4 -3.4生物化反应池··············································································· - 4 -3.5二沉池··························································································· - 6 -3.6浓缩池··························································································· - 6 - 第三章构筑物设计计算 ·····························································- 6 -1格栅 ············································································- 6 -1.1设计说明······················································································· - 6 -1.2设计计算······················································································· - 7 -2沉砂池 ······································································· - 10 -2.1设计说明······················································································- 10 - 3初沉池 ······································································· - 11 -3.1设计说明······················································································- 11 -3.2设计计算······················································································- 11 - 4生化池 ······································································· - 12 -4.1设计说明······················································································- 12 -4.2设计计算······················································································- 13 - 5二沉池 ······································································· - 20 -5.1设计说明······················································································- 20 -5.2设计计算······················································································- 20 - 6液氯消毒 ···································································· - 23 -6.1设计说明······················································································- 23 -6.2设计计算······················································································- 23 - 7污泥浓缩池 ································································· - 24 -7.1设计说明······················································································- 24 -7.2设计计算······················································································- 24 -8 污泥消化池 ································································· - 25 -8.1设计说明······················································································- 25 -8.2设计计算······················································································- 26 - 9浓缩污泥提升泵房 ························································ - 32 -9.1设计选型······················································································- 32 -9.2提升泵房······················································································- 32 -9.3污泥回流泵站··············································································- 32 -10污泥脱水间 ······························································· - 33 -10.1设计说明······················································································- 33 -11鼓风机房 ·································································· - 33 - 12恶臭处理系统 ···························································· - 33 -12.1设计说明······················································································- 33 -12.2设计计算······················································································- 33 -12.3风机选型······················································································- 34 - 第四章污水处理厂总体布置 ····················································· - 35 -1总平面布置 ································································· - 35 -1.1总平面布置原则··········································································- 35 -1.2总平面布置结果··········································································- 35 -2高程布置 ·································································································- 36 -2.1高程布置原则··············································································- 36 - 第五章参考文献 ···································································· - 36 -。
目录摘要 (1)Abstract (1)设计说明书1. 工程概况 (2)1.1. 自然条件 (2)1.2. 进厂污水 (3)1.3. 出水水质要求 (3)2. 主工艺比选 (3)2.1. 污水水质分析 (4)2.2. 可选工艺 (5)2.2.1. 传统A2/O工艺 (5)2.3. 主工艺确定 (5)3. 工艺流程设计说明 (6)3.1. 一级处理设计说明 (6)3.1.1. 中隔栅 (6)3.1.2. 细格栅 (6)3.1.3. 沉砂池 (7)3.1.4. 污水提升泵房 (7)3.3. 污泥处理系统设计说明 (8)3.3.1. 储泥、搅拌、提升 (8)3.3.2. 污泥浓缩脱水车间 (8)3.4. 加药系统设计说明 (9)3.4.1. 加药(碱度补充)系统 (9)4. 污水厂布置说明 (9)4.1. 整体布局 (10)4.2. 办公生活区 (10)4.3. 污水处理区、动力区 (10)4.4. 污泥区、加药区 (10)摘要本工程为城市污水处理厂工艺设计(7万m3/d),地处,日处理城市污水7万方。
进厂污水氮含量较高,磷含量正常,污水处理重在脱氮,兼顾除磷。
本工程采用不设初沉池的三沟不等体积A2O工艺,采用新型的8阶段同步脱氮除磷运行模式,较传统的6阶段模式强化了除磷功能,减小了边沟体积从而减少了厌氧释磷量,具有良好的脱氮除磷效果。
三沟交替运行,构筑物集中个数少,无需初沉池二沉池;抗冲击负荷能力强,出水水质稳定,污泥稳定无需消化。
本工程采用水下推流器和薄膜微孔曝气器组合的复合曝气模式,突破了氧化沟的深度限制,达到6m,提高了氧利用效率,节能省地。
污水经过中细格栅、沉砂池等一级处理和A2O二级处理后达到排放标准,直接排放或回用。
本工程处理效果好,能耗低,厂构筑物集约,自动化程度高,管理方便。
AbstractThis projiect is "Jinan wastewater treatment factory technological design (70000m3/d) ". This project locates at Jinan in Shanxi province . Entering factory sewage nitrogen content is higher, the phosphor content is normal, the wastewater treatment is heavy to be taking off nitrogen, gives attention to both in phosphor.This project adoption doesn't establish three ditches that the beginning sinks pond not to wait the physical volume A2O type to oxidize a ditch craft and adopt new of 8 stages synchronously take off nitrogen the phosphor circulates mode, besides which, more traditional of 6 stage modes enhanced in addition to phosphor function, let up the side ditch physical volume to reduce to be disgusted with oxygen to release amount of Lin thus, had to goodly take off nitrogen in addition to phosphor effect. the water fluid matter stabilizes, dirty mire's stabilizing don't need digest.This engineering adoption underwater pushes to flow a tiny bore Pu spirit machine of machine and thin film to combine of compound Pu spirit mode, broke the depth restriction of oxidizing the ditch, raised oxygen to make use of an efficiency, economize on energy ground in the province.Sewage through medium thin space grid, sink sand pond etc. an attain exhaustion standard after oxidizing the second class processing of ditch, directly emissions or time is used.This engineering handles effective, can consume low, construct a thing inside the factory intensive, automate degree Gao, manage convenience.设计计算说明书1.工程概况1.1.自然条件本工为“城市污水处理厂工艺设计”,工程所在地为地区,工程所在地的人口、自然、气象、地址条件如下:1、设计人口(近期)46万人。
污水处理厂设计说明书一、引言污水处理是城市发展和环境保护的重要组成部分。
随着人口的增加和工业化的发展,废水排放量也不断增加,对环境造成了严重的污染。
污水处理厂的设计和建设是解决这一问题的关键。
本文将针对污水处理厂的设计进行详细说明,包括工艺流程、设备选择、操作维护等方面。
二、污水处理厂工艺流程(一)进水处理污水处理厂的工艺流程首先是进水处理,确保污水在进入厂区前得到预处理,以去除大颗粒物质和有机负荷。
常见的进水预处理工艺包括格栅、沉砂池、调节池等。
格栅可以去除大颗粒物质,沉砂池可以去除沉积物,而调节池可以平衡进水的流量和水质。
(二)生化处理生化处理是污水处理厂的核心环节,主要通过微生物的降解作用去除有机负荷。
常见的生化处理工艺有活性污泥法、厌氧处理法、膜法等。
活性污泥法是最常用的工艺,通过投加活性污泥,利用微生物对有机物进行降解,同时产生污泥和沼气,具有较高的去除率和较低的投资成本。
(三)沉淀处理生化处理后的污水需要进行沉淀处理,以去除残余的悬浮颗粒物质和污泥。
常见的沉淀池包括一沉池、二沉池和气浮池等。
一沉池适用于较小的处理规模,可以去除大部分悬浮颗粒物质;二沉池则适用于较大的处理规模,能够进一步提高去除率;气浮池则适用于高浓度悬浮物质的去除。
(四)消毒处理为了确保出水质量达标,处理后的污水需要进行消毒处理,杀灭其中的病原微生物。
常见的消毒方法有紫外线照射、氯消毒等。
紫外线照射是一种较为常用的无化学消毒方式,通过紫外线的照射,破坏微生物的生物结构;氯消毒则是通过加入氯化物,生成有氯消毒副产物,达到杀灭微生物的目的。
三、污水处理厂设备选择(一)进水预处理设备进水预处理设备的选择应根据进水水质和处理量来确定。
常见的进水预处理设备有格栅、沉砂池、调节池等。
格栅可采用机械格栅或光栅,选择应考虑排水量和清理方便性;沉砂池可采用圆形或矩形,选择应考虑沉砂效果和占地面积;调节池可根据进水水质的变化确定尺寸和配置。
说明书第一章概述1.1设计目的与任务1.1.1目的本次课设设计的目的在于加深理解所学知识,培养学生运用所学理论和有关工程知识综合分析和解决实际工程设计问题的初步能力,使学生在设计,运算、绘图、查阅资料和设计手册以及使用设计规范等基本技能上得到初步训练和提高。
1.1.2任务根据所给资料,设计一座污水处理厂,要求确定污水处理的流程,处理构筑物的工艺尺寸的计算,确定污水处理厂平面布置和高程布置,最后绘出处理厂平面布置图、工艺流程图,并简要写出一份设计说明书和工艺计算书。
1.2基础资料1.2.1城市概况右所镇位于玉溪市澂江县中部,抚仙湖畔,地处东经102°47′09″~102°57′20″,北纬24°30′30″~24°46′18″之间, 东与九村镇、海口镇接壤,西与龙街镇、凤麓镇为邻,北靠阳宗镇,南临抚仙湖。
为Ⅰ类水质,不仅是我国第二大深水湖泊,也是云南省蓄水量最大的湖泊。
1.2.2自然特征右所镇地处澂江坝子东部,为多平坝、少山区的坝区。
辖区海拔在1733米至2380米之间。
右所镇境内属北亚热带季风气候,东暖夏凉,四季如春,冬季少雨,夏秋多雨,雨热同季,日照充足,冬夏温差11℃,年平均气温15.5℃,年极端最高温度33.7℃,最低温度-3.9℃,年平均日照2102小时,年平均降雨量594毫米,无霜期274天。
自然灾害主要有冬春连旱、局部性洪灾、低温霜冻及病虫害等。
右所镇处于抚仙湖北岸,河岸线长14.6公里,主要河流有东大河等,灌溉沟渠便利丰富。
1.2.3基础资料设计人口数量为25000人;排入水体水文资料为最高水位1849m 、98%保证枯水位1847m 、水量为12m 3;厂区平坦且标高为1852m 、入厂污水管道埋深为2.5m 。
污水处理厂出水水质指标达到GB18918-2002一级B 标准排放,污水厂进出水水质指标如下表1所示。
第二章 污水处理厂说明2.1污水处理厂处理规模由于澄江县龙街镇(右所)为旅游城镇,周边无及镇内无工厂企业,故水厂设计规模不考虑工业企业用水,仅考虑生活用水即可。
目录一 设计原始资料 1二 设计步骤 1㈠ 污水处理程度的确定 11 设计流量 12 污水BOD的处理程度确定 1㈡ 处理工艺流程的选择 2㈢ 各处理单元的设计 21 进水管道的计算 22 粗格栅 23 污水提升泵房 44 泵后细格栅 45 沉砂池56 曝气池 67 二沉池集配水井 138 二次沉淀池 139 污泥提升泵房 1510 污泥浓缩池 1511 贮泥池 17㈣ 附属构筑物 18三 处理厂规划 181 平面布置 182 高程布置 19一、 设计原始资料设计水量Q=4万m 3/d 进水管管底标高-3.50m 排放水体常年洪水位标高-2.00m 污水厂所在地面标高为0.00m 进水BOD=220mg/L 出水BOD=30mg/L 常年主导风向东南风二、 设计步骤㈠.污水处理程度的确定1.设计流量该城市每天污水的平均流量 s L d m Q /963.462/400003==平均 由《排水工程》(下册P59)查得,污水总变化系数K Z =1.382 所以s L d m Q Q /81.639/55280382.1400003max ==×==设计 2.污水BOD 的处理程度确定原污水的BOD 5值为220 mg/L ,本设计不采用初沉池,则进水曝气池污水的BOD 5值S a = 220 mg/L处理水中非溶解性BOD 5的值,即L mg C bX BOD e a /67.7304.009.01.71.75=×××==式中 b——微生物自身氧化率,一般介于0.05~0.10之间,此处取0.09; X a ——活性微生物在处理水中所占比例,取0.4; C e ——处理水中悬浮固体浓度,取30 mg/L。
处理水中溶解性BOD 5值为(出水BOD 5值30mg/L) S e = 30-7.67=22.33 mg/L 则BOD 的去除率 %8.89%10022033.22220=×−=η㈡处理工艺流程的选择由于污水的水质较好,污水处理工程没有脱氮除磷的特殊要求,主要的去除目标是BOD 5,本设计采用活性污泥法二级生物处理,曝气池采用传统的推流式曝气池。
设计说明书
一、工程慨况
为促进国民经济的发展,改善城市环境,某市政府决定兴建城市污水处理厂。
1、工程规模
根据该市城市总体规划,工程纳污范围内排污统计数据,考虑远期发展,确定工程规模为50000 t/d。
2、水质指标:
根据该市环保局提供的现状污染源监测资料,考虑到将来的发展,设计进水水质确定为:
COD cr: 350∽450mg/l
BOD5 : 200mg/l
NH4+-N: 40mg/l
SS: 250∽360mg/l
PH值:7∽8
设计水质根据环保部门要求,出水水质应达到国家标准«城镇污水处理厂污染物排放标准»(GB18918-2002)规定的二级标准:COD≤100mg/l, BOD5≤30mg/l, NH4+-N≤15mg/l,SS ≤30mg/l
3、设计范围
该厂所在城市主导风向为东南风,服务人口32万左右,占地约20亩。
设计包括:污水厂总平面图;污水厂处理工艺流程图;各主要处理构筑物施工图。
二、工程设计
1、污水处理目的之一是保护水环境不受污染,因此处理后出水要达到排水水质标
准;目的之二是污水回用,处理后出水用于农田灌溉、城市中水和工业生产等,为此处理水要满足相应的用水要求。
2、根据国内外城市污水处理厂的设计及运行经验,用于城市污水厂处理的污水处
理工艺主要有:传统活性污泥法,厌氧-好氧活性污泥法(A/O)、SBR法、AB法及氧化沟法等。
传统活性污泥法:分表面曝气和鼓风曝气两种型式,其历史悠久,运转管理经验成熟,对有机物的处理效果好,BOD5去除率可达到90%以上,但其脱氮除磷效果很差,对氮的去除率只能达到20%∽40%左右,对磷的去除率只能达到10%∽20%左右。
厌氧-好氧活性污泥法(A/O法):主要特点是将生物处理构筑物按功能分为厌氧区和好氧区,污水流经各分区时,不同微生物菌群将对有机物、磷进行降解和吸附,去除率均可达到90%以上。
若在好氧区前增加一个缺氧区,便形成A2/O工艺,达到同时脱氧除磷的目的。
SBR法:又称序批式活性污泥法,与传统活性污泥法的区别在于原污水不是顺次流经各个处理单元,而是流入单一反应池内,按时间顺序完成进水、反应、沉淀、出水和闲置等5个基本过程。
污水在反复的“好氧-缺氧”中完成去碳,脱氮,在反复的“好氧-厌氧中”完成除磷,整个运行程序由计算机自动控制。
其主要特点是反应和沉淀在一个池子内完成,不需沉淀池及污泥回流系统,而且脱氮除磷效果好,该法在澳大利亚和美国应用较广泛。
AB法:是一种两段活性污泥法,即吸附-生物降解法。
A段以较高的污泥负荷、较短的曝气时间使有机物被生物吸附,B段则按常规活性污泥法运行。
该法的特点是对有机物去除率很高,对氮和磷具有一定的去除效果,但产生的剩余污泥量大,构筑物较多,运行管理较复杂,适宜于处理有机物含量较高的污水。
氧化沟法:是一种该良活性污泥法,其特点是污泥负荷底,曝气时间较长,剩余污泥量较小。
可在氧化沟内设置相对独立的缺氧区和好氧区,从而达到脱氧的目的。
其缺点是占地面积较大,通常采用表面曝气,充氧动力效率底,能耗较大。
由于该厂对BOD去除率要求较高,根据以上对城市污水处理厂几种方法的特点分析,拟选用传统活性法。
活性污泥法工艺流程满足如下工艺流程的要求:
剩余污泥3、主要处理构筑物说明:
1)、格栅:
格栅由一组平行的金属栅条或筛网制成,安装在污水渠道、泵房集水井的进口处或污水处理厂的端站,将污水中的大块污物拦截,以免其对后续处理单元的机泵或工艺管线造成损失。
本格栅类型采用钢丝绳牵引式机械格栅;优点:适用范围广泛,无固定部件者维修方便;缺点:水下有固定部件者维修时易停水,钢丝绳易腐朽。
由于此污水厂处理的是城市污水,因此采用中细两道格栅。
2)、沉砂池
沉砂池的功能是去除密度较大的无机颗粒(如泥砂、煤渣等,对密度为2.65)。
沉砂池一般设于泵站、倒虹管前,以便减轻无机颗粒对水泵、管道的磨损;常用的沉砂池有平流沉砂池、曝气沉砂池等。
本系统采用平流沉砂池,它由入流渠、出流渠、闸板、水流部分及沉砂池斗组成。
具有截留无机颗粒效果较好,工作稳定,结构简单,处理效果较好,因此采用平流沉砂池。
3)、沉淀池
沉淀池按其在处理流程中的位置不同,可分为初次沉淀池和二次沉淀池,初沉池是一级污水处理厂的主要构筑物或作为二级污水处理厂的预处理构筑物设在生物处理构筑物的前面。
处理的对象是悬浮物质(SS约可去除40%∽55%以上),同时可去除部分BOD(约占总BOD的20%∽30%主要是非溶解性BOD),以改善生物处理构筑物的运行条件,并减低其BOD 负荷。
初次沉淀池中沉淀的物质称为初次沉淀污泥。
二次沉淀池设在生物处理构筑物(传统活性污泥法)的后面,用于沉淀分离活性污泥并提供污泥回流。
沉淀池按池内水流方向的不同,可分为平流式沉淀池,竖流式沉淀池和辐流式沉淀池。
4)、曝气池
此污水处理厂要求处理效率高;并适合处理要求高、水质稳定的废水,所以采用普通推流式曝气池。
曝气器采用天津纪庄子污水处理厂所开发的网状膜曝气器;优点为:产生的气泡直径较好且不易堵塞,布气均匀,空气不需过滤处理,构造简单,维修方便。